Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP16-0111
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/09/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) SITE HAS BEEN CLEARED AND ROUGH GRADED 2) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 3) POSTA YOUR NOI ON SITE 4) INSTALL A CONCRETE WASH OUT 5) PERFORM STORM WATER SELF INSPECTIONS 6) SWEEP UP TRACKED SOIL, MAINTAIN SEDIMENT CONTROLS 7) CALL FOR INSPECTION FRO ANY SITE CONCERNS AND PRIOR TO COVERING UNDERGROUND SITE WORK |