Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 03/19/2019 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 12/05/2018 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Install controls as needed. |
| 03/29/2018 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Partial Approval |
Entered by CBELL1 - |
| 03/17/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ADD SUPPLEMENTAL SEDIMENT CONTROLS AROUND THE TEMP STOCKPILE.
2) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS |