Permit: DP16-0111

Parcel: 11504343A


Addresses:

1101 N 4TH AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0111

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/19/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
01/24/2019 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - Trash enclosure Rebar pad is OK. The walls appear to have been grouted without rebar inspection.
12/06/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CBELL1 - Trash and closure footings okay for concrete. Note Terracon is the special inspector.
12/05/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - Trash enclosure footings have no rebar at this time reschedule for inspection when ready.
03/21/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
03/21/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
12/05/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractor is installing site wall and trash enclosure at this time.
03/29/2018 ENGR Grading Final MRUSSO Partial Approval Entered by CBELL1 -
03/06/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - STOPPED BY THE SITE TO CHECK ON THE CONSTRUCTION OF THE PEDESTRIAN RAMP ALONG THE WEST SIDE OF THE NEW BUILDING. THE CONTRACTOR HAS ADVISED ME THAT THE WALKWAY IS NOT A RAMP AND WILL HAVE A RUNNING SLOPE OF LESS THAN 5% WHEN IT IS COMPLETED. I REMINDED HIM THAT IF ANY PORTION OF THE AREA IS OVER 5% IN THE RUNNING IT WILL HAVE TO ADA COMPLIANT HANDRAIL. I WILL VERIFY WITH THE BUILDING OFFICIAL PRIOR TO PERFORMING THE FINAL INSPECTION OF THE SITE.
12/05/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - LOOKED AT TWO PRE-CAST CONCRETE CATCH BASINS/BUBBLER BOXES. TOOK PICTURES OF PIPE TIE INTO BOXES. OK TO COVER
09/28/2017 ENGR Grading Final MRUSS0 Continued Entered by DROBERT5 - 1) INSTALL OF 12" AND 18" HDPE STORM WATER TRUNK LINE AND CATCH BASINS ALONG EAST SIDE OF BLDG. 2) PICTURES TAKEN OF TRANSITION POINTS AND BEDDING MATERIAL 3) VERIFICATION OF SIZE, SLOPE, AND INSTALL PROCEDURES OK TO COVER
09/26/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) LOOKED AT 18" HDPE STORM PIPE ALONG EAST SIDE OF BLDG 2) ENSURE PROPER SLOPE, PIPE IS BEDDED TO SPRING LINE AND TRENCH IS COMPACTED 3) CALL FOR INSPECTION FOR PRIOR TO COVERING PIPE TRANSITIONS AND DRAINAGE STRUCTURES PICTURES TAKEN 4) ENSURE YOU COMPLY WITH YOUR STORM WATER PERMIT AND PLAN.
03/17/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE WORK AT THIS TIME