Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 03/21/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by CBELL1 - |
| 03/19/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There are no issues at this time |
| 01/30/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There is minor track out onto fourth Avenue |
| 01/24/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No concerns at this time. |
| 03/29/2018 |
SITE - Stormwater Follow-up
|
MRUSSO |
Partial Approval |
Entered by CBELL1 - |
| 12/05/2018 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - there are no issues at this time. |
| 09/26/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT 18" HDPE STORM PIPE ALONG EAST SIDE OF BLDG
2) ENSURE PROPER SLOPE, PIPE IS BEDDED TO SPRING LINE AND TRENCH IS COMPACTED
3) CALL FOR INSPECTION FOR PRIOR TO COVERING PIPE TRANSITIONS AND DRAINAGE STRUCTURES
PICTURES TAKEN
4) ENSURE YOU COMPLY WITH YOUR STORM WATER PERMIT AND PLAN. |
| 03/17/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ADD SUPPLEMENTAL SEDIMENT CONTROLS AROUND THE TEMP STOCKPILE.
2) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS |