Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - |
| 03/19/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - |
| 12/05/2018 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Superintendent does not have a permit card. |
| 03/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - this is the final phase of this project on the north east site. The rest of the site was inspected and completed previously by other inspector |
| 03/19/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - ADA parking spaces for this phase in the north east corner of the site are In compliance |
| 03/29/2018 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) COMPLETE SITE/GRADING WORK PER YOUR APPROVED PLANS.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD.
3) HC PARKING ALONG THE NORTH SIDE OF BLDG DOES NOT MEET THE NO GREATER THAN 2% SLOPE IN ANY DIRECTION REQUIREMENT.
|