Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP16-0108

Parcel: 11619153A


Addresses:

450 N FREEWAY

Inspection Status: Passed

Inspection History: SITE - Stormwater Final Inspection

Date Description Inspector Results Comments
01/23/2019 SITE - Stormwater Final Inspection BBENEDON Approved Entered by CBELL1 -
01/17/2019 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by CBELL1 - I have not yet seen the notice of termination for the Swift.
12/18/2018 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by CBELL1 - Provide not and clean up track out on Street.
12/06/2018 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by CBELL1 - 30 in CMP and Grading installed as shown wlb field bulletin number one dated June 18th 2018. Provide City approved plans also transportation department inspection of work in the right-of-way area. Zack and I spoke with Elizabeth from TDOT, she said that the plan has been approved through her department but still needs to go to DSD, and she said she will send a transportation inspector to the site. Note I pointed out to Zack from Canyon building that there is standing water in the north basin it's been 7 days since the last rain
12/03/2018 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by CBELL1 - Provide notice of termination for SWIPP, provide revisions for all changes
11/16/2018 SITE - Stormwater Final Inspection DROBERTS Not ready for Inspection Entered by DROBERT5 - CANCELLED BY THE CONTRACTOR
09/05/2018 SITE - Stormwater Final Inspection DROBERTS Not ready for Inspection Entered by DROBERT5 - SITE NOT READY FOR THIS FINAL INSPECTION
07/13/2018 SITE - Stormwater Final Inspection GWEST Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY FOR THIS INSPECTION AT THIS TIME. I HAVE ADVISED ZACH THAT MOST OF THE WORK FOR THE SITE HAS TO BE COMPLETED PRIOR TO SCHEDULING THIS INSPECTION IN THE FUTURE. IF THIS INSPECTION IS SCHEDULED PRIOR TO THE SITE BEING READY IT CAN CAUSE THAT ADDITIONAL FEES BE CHARGED FOR PERFORMING OTHER WORK, HAVE ASKED THAT THEY CONTACT ME IF THEY ARE LOOKING AT CLOSING THIS SITE. OUT.
06/08/2018 SITE - Stormwater Final Inspection DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THIS PARTICULAR INSPECTION.
04/27/2018 SITE - Stormwater Final Inspection MRUSSO Continued Entered by DROBERT5 - 1) ENSURE FINAL STABILIZATION IS ACCOMPLISHED 2) SUBMIT A NOTICE OF TERMINATION AT COMPLETION