Permit: DP16-0108

Parcel: 11619153A


Addresses:

450 N FREEWAY

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/02/2019 ENGR Engineering Final DROBERTS Approved Entered by CBELL1 -
03/18/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - Pending previously requested paperwork from project engineer
03/18/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - It appears that the contractor has corrected the depressed landscaping areas to comply with construction documents. OK to approve pending the previously requested documentation. 1 An approved plan revision, 2 A letter from the engineer stating that the grading is in compliance withplan specifications dated after the last corrections made
03/11/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Dave and Ron and I met with Zac and Willy Canyon builders as well as a representative from Eaglerock. The landscape areas on the plan with a note requiring a 6 inch depression have only about two or 3 inches depressed and do not appear to meet the width shown but not specified. Determination is made that the engineer of record will provide documentation to quantify the retention capacities of these areas.
03/08/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - I met with Zac on site. We used a 4 foot level and a string where we could to try to measure the depressed areas. It appears that they are only 3 inches below the curb openings. We also still need the revised plans and the letter from the engineer certifying grading.
02/06/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - I met with Zac on site and looked at the approved plans. I have not yet seen the revision for the work at the drainage canal, or a fix for the basin that was not draining, or a letter excepting the grade from the engineer. I showed and discussed with Zac the requirement for 6 inch recessed landscape areas, they currently have roughly 1 to 4 inches of recessed area but only in the center of the planter. I also noted there is a Rosian present in the bottom of the drainage canal which is unprotected. WLB is the engineer of record. Note there is track out from the site
01/23/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Contractor and paperwork are not on site no message was provided. Complete all the work noted including a letter from your engineer for the grade and plan revisions for the changes made to the rain water drainage, and correction for the basin . provide plans. Landscaped areas shall be 6 inches below curb openings as previously noted and discussed with Zak. Stabilization is in progress. No problem for TCO
04/10/2019 ENGR Engineering Final DROBERTS Approved Entered by CBELL1 -
04/02/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by CBELL1 - 1) Complete all rock riprap as shown on the approved plans usual utilizing Maraffi filter fabric underneath the hand placed rock riprap. 2) There is also a 5 to 10' band of disturbed soil along the North side of the project between the City of Tucson "No Trespassing" signs and the DG on the project site. This area of disturbed soil that will need to be hydro seeded or have additional DG placed on to it.
02/07/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Note the basin has very little remaining water in the very bottom 26 hours since the last precipitation. The erosion downstream of the basin has not yet been corrected
02/06/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - I met with Zac on site and looked at the approved plans. I have not yet seen the revision for the work at the drainage canal, or a fix for the basin that was not draining, or a letter excepting the grade from the engineer. I showed and discussed with Zac the requirement for 6 inch recessed landscape areas, they currently have roughly 1 to 4 inches of recessed area but only in the center of the planter. I also noted there is a Rosian present in the bottom of the drainage canal which is unprotected. WLB is the engineer of record. Note there is track out from the site
01/23/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Contractor and paperwork are not on site no message was provided. Complete all the work noted including a letter from your engineer for the grade and plan revisions for the changes made to the rain water drainage, and correction for the basin . provide plans. Landscaped areas shall be 6 inches below curb openings as previously noted and discussed with Zak. Stabilization is in progress. No problem for TCO
01/17/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - Engineering inspector has no issues that would prevent a temporary C of o.
12/26/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Walkways and accessible spaces have been checked and are okay. Inspector has no issues that would prevent a TCO. The Basin is not draining and will require an engineering fix. Complete trap Channel construction and stabilization for detail number 9. Correct areas with puddling at Monument sign and Northeast curb opening and correct erosion as needed. Depressed landscape area 6" below carb opening as shown on grading plan. Remove concrete forms of irrigation backflow assembly. Terminate clean house. Provide stabilization of easement and dirt lot. Install Ada parking signs for the concrete footing 9 by 18. Complete riprap per plan specifications. Remove waddle and clean up chalk out. Not number 68412 received
12/18/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - I spoke with Zak about requirements for final approval including the letter from the engineer, not, completing the work on the plan, pending revision.
06/08/2018 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THIS INSPECTION, THE COMMENTS FOR TODAY WILL BE PLACED IN THE GRADING INTERMEDIATE INSPECTION COMMENTS.