Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/16/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 06/14/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO PE-CON MEETING CALLED IN. COMPLAINT FOR TRACKING ONTO PUBLIC ROADWAYS.
2) PROVIDE AN APPROVED PLAN, PERMIT AND STORM WATER PERMIT/PLAN ON SITE FOR INSPECTION
3) COMPLY WITH SWPPP
4) SWEEP TRACKED SOIL ROUTINELY
COMPLY BY 10 WORKING DAYS. NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER |