Permit: DP16-0100

Parcel: 12218280B


Addresses:

3855 E SPEEDWAY BL

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
09/02/2016 ENGR Grading Final MRUSSO Approved Entered by MRUSSO1 -
09/02/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 -
09/02/2016 ENGR Grading Final MRUSSO Approved Entered by MRUSSO1 -
09/06/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - SITE INSPECTION ONLY, SITE WILL RECHECKED ON 9/7/16
09/21/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE AREA TO BE POURED TODAY AT 7:45, IT ALL APPEARS TO BE LESS THAN 2% IN ALL DIRECTIONS. I REMINDED THE CREW TO CHECK THE AREAS OUT DURING THE FINISH PROCESS TO MAKE SURE THAT THEY DO NOT EXCEED 2% IN ANY DIRECTION IN THE HANDICAP PARKING AREAS(EAST SIDE) AND THAT THE CROSS SLOPE OF THE SIDEWALKS ARE LESS THAN 2%. i CHECKED THE AREA AT THE END OF THE DAY AND FOUND THE FOLLOWING:
09/12/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - I MET WITH ANDREW AND LOOKED OVER THE SITE THE PARKING ON THE WEST SIDE OF THE SITE. THE CONCRETE AREAS THAT WERE POURED ON SATURDAY ARE LESS THAN 2% AND HAVE BEEN PASSED. THE CREWS WILL BE WORKING ON THE POURING OF THE CROSS WALK COMING IN FROM SPEEDWAY TODAY. THEY ARE ALSO WORKING ON THE REMOVAL OF CONCRETE UNDER NEATH THE CANOPY, THIS WILL BE REPOURED ON TUESDAY ALONG WITH THE TIE-INS FOR THE PARKING SPACES AND THECROSS WALK TO THE EXISTING PAVEMENT. I AM ANTICIPATING THAT WHEN I LOOK AT THE SITE TOMORROW THEY WILL ALSO HAVE THE CONCRETE REMOVED FROM THE EAST HANDICAP ACCESS PARKING AREAS THAT EXCEED THE 2% MAXIMUM SLOPES THAT ARE ALLOWED BY OUR CURRENT CODES.
09/10/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - 7:00 A.M. I LOOKED AT THE AREAS THAT THEY HAVE READY FOR CONCRETE, THEY STILL APPEAR TO BE EXCEEDING THE SLOPE PERCENTAGES FOR THE PARKING SPACES AND ACCESS AISLES. I HAVE ASKED THEM TO MAKE SURE AND PLACE ALL EXPANSION MATERIALS AGAINST THE EXISTING CURBS AND TO ENSURE THAT THEY ARE NOT TOO STEEP. THEY WILL BE PLACING A HEADER FORM AT THE SOUTHSIDE OF THE PARKING AREA TO HELP ENSURE THAT THEY DO NOT CREATE THE SAME PROBLEM THAT THEY DID ON THE OTHER AREA. 9:30 I LOOKED AT THE AREA TO SEE IF THE CHANGES HAVE BEEN MADE AS PREVIOUSLY DISCUSSED. THEY ARE MODIFYING THE GRADES IN THE PARKING AREAS AND WILL BE REPLACING THE REBAR BACK INTO THE AREA. THEY HAVE ADVISED ME THAT THEY WILL SET THE SOUTHERN FORM BOARD, AND WILL THEN RECHECK THE GRADES TO MAKE SURE THAT THEY HAVE CHECK ALL THE GRADES ONCE AGAIN PRIOR TO POURING. I HAVE REMINDED THEM THAT IF IT FALLS OUT OF SPEC IT WOULD HAVE TO BEMOVED AND REPOURED LIKE THE OTHER SIDE OF THE SITE. I LEFT FOR THE DAY AND WILL RECHECK WITH THEM LATER TODAY.
09/09/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - STOPPED BY AND LOOKED OVER THE WORK THAT THEY ARE DOING TODAY. THEY HAVE STARTED THE CUTTING AND REMOVING OF THE EXISTING PAVEMENT FROM THE PAAL AND ARE ALSO WORKING ON GRADING AND COMPACTING THE AREAS FOR THE SIDEWALK COMING IN FROM SPEEDWAY. I HAVE REMINDED THEM THAT THE SLOPE OF THE CONCRETE SIDEWALK CANNOT EXCEED 5% OR THEY WILL HAVE TO ALSO INSTALL HANDRAILS, AND TO MAKE SURE THAT THE CROSSSLOPE OF THE SIDEWALK AREA IS NO GREATER THAN 2%. I CHECKED BACK LATER IN THE DAY AND LOOKED AT WHAT THEY HAVE COMPLETED THROUGHOUT THE DAY. THEY HAVE FORMED THE SIDEWALK FROM SPEEDWAY AND IT APPEARS TO BE BELOW THE 5% MAXIUM. THE STRING GRADE THAT THEY ARE SHOWING FOR THE FINISH GRADE OF THE CROSSWALK APPEARS TO BE HIGH AND MAY CREATE A SITUATION THAT MAY CAUSE SOME MINOR PONDING OF WATER IN AREAS WHEN IT RAINS. I HAVE ASKED THAT THEY VERIFY THAT THE GRADES ARE GOING TO WORK SO THAT DO NOT HAVE TO REMOVE ANY OF THE CONCRETE AFTER IT IS POURED. I WENT OVER AND LOOKED AT THE AREAS THAT THEY POURED EARLIER THIS WEEK AND SEE THERE ARE AREAS WHERE THE SLOPES EXCEED 2% IN THE PARKING SPACES AND THE ACCESS AISLES. I HAVE ADVISED THEM THAT THEY WILL NEED TO VERIFY ALL THE AREAS THAT WILL HAVE TO BE REMOVED AND REPOURED. I WILL LOOK AT THESE AREAS WHEN I COME BACK OUT TO THE SITE.
09/08/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - I STOPPED AND CHECKED THE FORMS FOR THE SIDEWALK, THEY WERE NOT READY SO I WILL CHECK IT AT 9:00. THE CREW WILL TRY TO POUR THIS THIS MORNING AND WILL THEN START ON PREPPING FOR THE POURING OF THE PARKING SPACES. I CHECKED THE SITE LATER IN THE DAY, THEY WERE ABLE TO POUR MOST OF THE SIDEWALK BUT STILL HAVE ONE SECTION LEFT ON THE WEST SIDE. WE LOOKED AT THE WORK THAT THEY HAVE STARTED FOR THE SIDEWALK COMIN IN FROM SPEEDWAY AND ACROSS THE PAAL. THEY WILL BE REMOVING THE EXISTING ASPHALT DRIVEWAY TOMORROW AND WILL START FORMING ALL OF THE REMAINING SIDEWALKS.
09/07/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE SITE AT THE END OF THE DAY TOO SEE WHAT WE COULD DO FOR THE CONTRACTOR. HE HAS FORMED THE SIDEWALK AREAS BUT DO NOT HAVE THEM WITHIN TH TOLERANCES FOR THE CROSS SLOPES. THEY WILL TRY TO MAKE THE NECESSARY CHANGES TO THE FORMS THIS AFTERNOON SO THAT I CAN STOP BY AND LOOK AT THE FORMS IN THE MORNING ON MY WAY INTO THE OFFICE. ALSO THEY HAVE REMOVED THE EXISTING PAVEMENT FROM THE AREAS UTILIZED FOR THE HANDICAP PARKING SPACES AND ACCESS AISLES. I HAVE ADVISED THEM THAT THEY MUST MAKE SURE THAT THIS AREA IS CHECKED TO ENSURE THAT THEY DO NOT EXCEED THE 2% SLOPE REQUIREMENTS IN ANY DIRECTION OF THE PARKING SPACES AND ACCESS AISLE. THEY WILL BE REMOVING THE CROSS WALK PAVEMENT ON FRIDAY SO THAT THEY CAN TRY TO POUR IT OVER THE WEEKEND.
09/02/2016 ENGR Grading Final MRUSSO Approved Entered by MRUSSO1 - RE-BAR LAY OUT FOR HC PARKING AREA AND ACCESS RAMP ON EAST SIDE OF PARKING LOT WAS INSTALLED PER THE APPROVED PLAN, OK TO POUR CONCRETE. CALL FOR INSPECTION FOR WEST SIDE PARKING AND ACCESS
10/11/2023 ENGR Grading Final Passed