Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/23/2018 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - SITE NOT READY AT THIS TIME, IT WILL BE RECALLED IN FOR NEXT MONDAY 10/29/2018. |
| 10/26/2018 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - Area one walkway is ready to pour |
| 10/19/2018 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - OK TO POUR THE SIDEWALK FROM THE RESTROOMS TO THE POOL AREA. HANDRAIL SHOULD NOT BE REQURED IN THIS AREA WHERE THE SLOPES EXCEED 5% DUE TO THE SHORT DISTANCE OF 6 FEET OR LESS. |
| 09/22/2016 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - LOOKED OVER THE SITE AND CHECKED THE SLOPES OF THE CONCRETE POURED YESTERDAY, EVRYTHING CHECKED IS LESS THAN 2% AND HAS BEEN ACCEPTED. THE FOLLOWING ITEMS STILL NEED ATTENTION AND MAY NEED TO BE CALLED IN EITHER TOMORROW OR NEXT WEEK. 1) COMPLETE ALL STRIPING FOR THE AREAS AS NOTED ON THE APPROVED PLANS. 2) INSTALL ALL HANDICAP ACCESS SIGNS FOR THIS SITE AS SHOWN ON THE APPROVED PLANS. 3) REMOVE ALL EXCESS MATERIAL FROM THE SITE THAT REMAINS AND CLEAN ALL AREAS OF CONSTRUCTION TRASH AND DEBRIS. 4) PROVIDE REVISED DRAWINGS SHOWING ALL THE INTERIOR WORK BEING REMOVED FROM THIS PERMIT. 5) PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE ALONG WITH THE REVISED DRAWINGS.
A RE-INSPECTION MAY BE NEEDED FOR THIS SITE ONCE EVERYTHIN HAS BEEN COMPLETED AS PREVIOUSLY NOTED IN THE PAST INSPECTIONS. |
| 09/21/2016 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - CHECKED THE SLOPES FOR THE SIDEWALKS AND THE HANDICAP PARKING ON THE EAST SIDE OF THE SITE. THE SLOPES APPEAR TO BE OKAY FOR ALL THE AREAS AT LESS THAN 2%, THESE AREAS WILL BE POURED LATER ON TODAY.
i WAS UNABLE TO STOP BY TO CHECK THE FINISH CONCRETE BUT WILL LOOK AT IT TOMORROW FOR A FINAL GRADING INSPECTION FOR THE SITE. |
| 09/08/2016 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - LOOKED AT THE FORMS THAT THEY HAVE FOR THE POURING OF THE SIDEWALKS ON THE SOUTHWEST SIDE OF THE BUILDING. MINOR MODIFICATIONS WILL BE MADE TO MAKE SURE THAT THEY DO NOT EXCEED THE MAXIMUM SLOPE VALUES. THE PARKING SPACES SOUTH OF THIS SIDEWALK AREA WILL BE POURED AT A LATER DATE, THIS WILL REQUIRE AN ADDITIONAL INSPECTION TO BE PERFORM FOR THE ACCEPTANCE.
|
| 09/07/2016 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - THE CREW HAS COMPLETED THE INSTALLATION OF THE REBAR AND WIRE MESH IN THE AREAS WHERE THE SIDEWALKS AND DRIVEWAYS ARE TO BE POURED. I HAVE REMINDED THE CONTRACTOR THAT HE NEEDS TO MAKE SURE THAT THE OPES IN THE PARKING SPACES ARE NOT TOO EXCEED |
| 09/02/2016 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by MRUSSO1 - RE-BAR LAY OUT FOR HC PARKING AREA AND ACCESS RAMP ON EAST SIDE OF PARKING LOT WAS INSTALLED PER THE APPROVED PLAN, OK TO POUR CONCRETE.
CALL FOR INSPECTION FOR WEST SIDE PARKING AND ACCESS |
| 10/11/2023 |
ENGR Engineering Final
|
|
Passed |
|
| 10/11/2023 |
ENGR Engineering Final
|
|
Passed |
|