Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/10/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 04/10/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/17/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET ALL NOTES FROM 3-26 AND COMPLET ALL WORK ON AP PLANS . OR PROVIDE COT AP AS-BUILTS FOR ALL CHANGES. CLEAN AND PROVIDE STABILIZATION FOR ALL DISTURBED AREAS. WENT OVER WITH GC ON SITE. |
| 03/26/2017 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - |