Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/13/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/19/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - REBAR MATT FOR TRASH ENCLOSUER( ONLY) OK. |
| 04/26/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by DROBERT5 - TRASH ENCLOUSER VERT REBAR NOT PAST BOND BEEM. |
| 02/07/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - REBAR IN FOOTER FOR TRASH ENCLOUSER (ONLY). |
| 09/21/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 09/13/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC WENT OVER SIDEWALKS AND ADA PARKING AREAS THAT ARE OVER ON SLOPES. PROVID CERT LETTER FROM ENGINEER OF RECORD FOR ALL GRADING AND DRAINAGE. AND AS-BUILTS AP BY COT BEFORE FINAL. COMPLET ALL WORK ON AP PLANS. |
| 09/05/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC AND GRADING CONTRACTOR ON SITE WENT OVER ADA PARKING OVER 2% AND SIDEEWALKS OVER 2% CROSS SLOPES |
| 08/31/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER WORK TO COMPLET FOR FINAL. |
| 08/09/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED PART OF SITE WITH AP PLANS GC NOT ON SITE . |
| 08/02/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON LANDSCAPING. AND SIDEWALKS. |
| 03/08/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC LOOKED AT RCP ON NORTH WEST SIDE OF SITE. |
| 12/21/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH DREW THE PROJECT MANAGER ABOUT STORMDRAIN PIPIING COVERED WITH OUT INSPECTION. AND NO SWPPP INFO AT GATE. AND MAKING REPAIRS TO CONTOLRS. |
| 09/21/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 10/04/2016 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - GOT WITH GC ABOUT GRADING WORK BEFORE PRE-CON MEETING. |
| 09/28/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |