Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/13/2017 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 07/26/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Partial Approval |
Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT ENTRANCE TO THE SITE
INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
5) PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIONS PER YOUR STORM WATER PLAN/PERMIT
6) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS OR CHANGES |