Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/13/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by MRUSSO1 - NOTE: SITE IS ABOUT 25% COMPLETE, A PRE-CON MEETING WAS NOT CALLED IN PRIOR TO CONSTRUCTION
1) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
2) INSTALL AND MAINTAIN SEDIMENT CONTROLS PER YOUR SWPPP
3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
4) INSTALL A STABIZED CONSTRUCTION ENTRANCE/EXIT
5) INSTALL AND MAINTAIN A CONCRETE WASH OUT ON SITE.
6) CALL FOR ANY QUESTIONS/CONCERNS/CHANGES WITH SITE/GRADING/LANDSCAPING |