Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP16-0038
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 08/07/2017 | ENGR Engineering Final | DROBERTS | Denied | Entered by DROBERT5 - NONE OF THE INSPECTIONS HAVE BEEN SCHEDULED FOR THIS PERMIT AND THE CONTRACTOR IS ASKING FOR THE APPROVAL OF THE COMBO PERMIT. I HAVE DENIED THAT PERMIT AT THIS TIME AND HAVE ASKED THAT HE CALL IN THE INSPECTIONS FOR THIS SITE TO ENSURE THAT ALL OF THE WORK FOR TH SITE PLAN HAS BEEN COMPLETED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. |
| 08/08/2017 | ENGR Engineering Final | DROBERTS | Denied | Entered by DROBERT5 - MET WITH THE CONTRACTOR ON THE SITE AND LOOKED OCER THE ITEMS THAT ARE INCOMPLETE AT THIS TIME. 1) THE BRICK PAVERS THAT ARE CALLED TO BE REMOVED AND REPLACES PER NOTE #15 HAVE NOT BEEN COMPLETED PER THE APPROVED PLANS. CURRENTLY ON THE SECTION IN THE AREAR OF THE OLD WHEELCHAIR ACCESS RAMP HAVE BEEN CHANGED, ALL THE OTHER AREAS STILL ARE NOT IN COMPLIANCE FO LESS THAN 2%. 2) THE NEW HANDICAP ACCESS RAMP TO THE 2 NEW HANDICAP PARKING SPACES AND ACCESS AISLE IS NOT COMPLIANT AT THIS TIME. THERE ARE VARIOUS LOCATIONS THAT EXCEED THE 2% MAXIMUM CROSS SLOPE. THIS AREA NEEDS TO BE REDONE SO THAT ALL THE SLOPES WITHIN THE RAMPS ARE BELOW THE MAXIMUM LIMITS. 3) A WATER HARVESTIN BASIN HAS BEEN SHOWN TO BE ON THE WEST SIDE OF THE NEW TRASH ENCLOSURE, THIS HAS NOT BEEN DONE PER THE APPROVED PLANS. ALSO IN THIS AREA IS A ELECTRICAL PULL BOX FOR THE PARKING LOT LIGHTING THAT MAY NEED TO BE REMOVED OR RELOCATED TO AN AREA THAT IS ABOVE THE FLOW LINE OF THE WATER HARVESTING BASIN. |
| 11/14/2023 | ENGR Engineering Final | Passed | ||
| 11/14/2023 | ENGR Engineering Final | Passed |