Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/07/2017 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 09/05/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - MET GC AND ROB EAST ON SITE WENT OVER WORK TO COMPLET FOR GRADING FINAL. SLOPES IN ADA PARKING AND DROP OFF OVER 2% .COMPLET BIKE PARKING. INSTALL RIP-RAP AT NEW CURB CUT. INSTALL HOLES FOR TRASH ENCLOSURE GATES. |
| 08/28/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 08/21/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 06/05/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 09/08/2017 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by FRODRIG2 - |
| 08/28/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 08/28/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 08/21/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 06/05/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |