Permit: DP16-0020

Parcel: 11011174J


Addresses:

2480 N ARCADIA AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0020

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/26/2017 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 - THE CONTRACTOR IS REPAIRING ESISTING SIDEWALK THAT HAS BEEN DAMAGED DURING CONSTRUCTION. THIS IS IN AN AREA WHERE SOME OF THE EXISTING SIDEWALK IS NON-COMPLIANT. I HAVE APPROVED THE SECTION WHERE THEY ARE WORKING AT THE TIME, BUT THE TIE-IN INTO THE EXISTING SIDEWALK IN OTHER AREAS WILL NOT BE ABLE TO PER THE CURRENT CODE.
05/09/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
05/09/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
01/30/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON CURBING ON NORTH SIDE OF SITE.
08/25/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SIDEWALKS ON WEST SIDE OF SITE.
08/02/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON CURBING IN SOUTH WEST PARKING AREA IN STALLING PER DETIAL 209.
08/01/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SOUTH SIDE OF SITE WITH GC.
07/06/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - 10'' SD PIPING ON WEST SIDE OF BUILDING 10' FROM TIE-IN.
07/05/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - 10'' PVC ON WEST SIDE OF BUILDING FROM NORTH END OF BUILDING TO3RD ROOF DRAIN.
02/01/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - DUE TO UTILITY WORK SIDEWALK WAS REMOVED NORTH OF GRANT ON ARCADIA AV . SIDEWALK TO BE REPLACED BACK TO SOUTH SIDE OF FRIST DRIVE WAY OPENING NORTH OF GRANT . PER BUILDING OFFICAL CLAYON TREVILLYAN.
01/31/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON SIDEWALKS JUST NORTH OF GRANT.
05/09/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
11/08/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - FOOTER FOR ADA RAMP ON SOUTH SIDE OF EX ISTING BUILDING.
10/31/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - INSPECTED FORMS AND REBAR FOR THE WALL LOCATED ON THE NORTHSIDE OF THE BANK AT THE NORTHWEST CORNER OF THIS SITE, OK FOR THE PLACEMENT OF CONCRETE.
10/27/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - LOOKED AT REBAR ON NORTH SIDE OF EXISTING BUILDING.
10/25/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR IN SIDE WALK ON NORTH SIDE OF EX BUILDING 100' OK.
10/24/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
10/23/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR SIDE WALK ON NORTH EAST SIDE OF BUILING OK.
10/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
09/11/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR MAT INSIDE TRASH ENCLOSUER ONLY OK.
09/07/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR WALL IN TRASH ENCLOSURE OK.
08/25/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - FOOTER FOR TRASH ENCLOUSER OK.