Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP16-0020
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/26/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - THE CONTRACTOR IS REPAIRING ESISTING SIDEWALK THAT HAS BEEN DAMAGED DURING CONSTRUCTION. THIS IS IN AN AREA WHERE SOME OF THE EXISTING SIDEWALK IS NON-COMPLIANT. I HAVE APPROVED THE SECTION WHERE THEY ARE WORKING AT THE TIME, BUT THE TIE-IN INTO THE EXISTING SIDEWALK IN OTHER AREAS WILL NOT BE ABLE TO PER THE CURRENT CODE. |
05/09/2018 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
05/09/2018 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
01/30/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CURBING ON NORTH SIDE OF SITE. |
08/25/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SIDEWALKS ON WEST SIDE OF SITE. |
08/02/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CURBING IN SOUTH WEST PARKING AREA IN STALLING PER DETIAL 209. |
08/01/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SOUTH SIDE OF SITE WITH GC. |
07/06/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - 10'' SD PIPING ON WEST SIDE OF BUILDING 10' FROM TIE-IN. |
07/05/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - 10'' PVC ON WEST SIDE OF BUILDING FROM NORTH END OF BUILDING TO3RD ROOF DRAIN. |
02/01/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - DUE TO UTILITY WORK SIDEWALK WAS REMOVED NORTH OF GRANT ON ARCADIA AV . SIDEWALK TO BE REPLACED BACK TO SOUTH SIDE OF FRIST DRIVE WAY OPENING NORTH OF GRANT . PER BUILDING OFFICAL CLAYON TREVILLYAN. |
01/31/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON SIDEWALKS JUST NORTH OF GRANT. |
05/09/2018 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
11/08/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FOOTER FOR ADA RAMP ON SOUTH SIDE OF EX ISTING BUILDING. |
10/31/2017 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - INSPECTED FORMS AND REBAR FOR THE WALL LOCATED ON THE NORTHSIDE OF THE BANK AT THE NORTHWEST CORNER OF THIS SITE, OK FOR THE PLACEMENT OF CONCRETE. |
10/27/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - LOOKED AT REBAR ON NORTH SIDE OF EXISTING BUILDING. |
10/25/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR IN SIDE WALK ON NORTH SIDE OF EX BUILDING 100' OK. |
10/24/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
10/23/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR SIDE WALK ON NORTH EAST SIDE OF BUILING OK. |
10/20/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
09/11/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR MAT INSIDE TRASH ENCLOSUER ONLY OK. |
09/07/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR WALL IN TRASH ENCLOSURE OK. |
08/25/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FOOTER FOR TRASH ENCLOUSER OK. |