Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/25/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/04/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - COMPLET DRAINAGE WORK ON SOUTH SIDE OF OLD BUILDING AND PROVIDE CERT LETTER FROM ENGINEER OF RECORD FOR GRADING AND DRAINAGE. |
| 05/09/2018 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER STAKING FOR TREES . PROVIDE CERT LEETER FROM ENGINEER OF RECORD AND AS-BUILTS. IF NEEDED. |
| 06/25/2018 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/21/2018 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - PROVIDE CERT LETTER FOR ALL GRADING AND DRAINAGE ON AP PLANS FROM ENGINEER OF RECORD. |