Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP16-0016

Parcel: 115154130

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
08/15/2016 ENGR Engineering Final MRUSSO Approved Entered by MRUSSO1 -
08/15/2016 ENGR Engineering Final MRUSSO Approved Entered by MRUSSO1 -
05/03/2016 ENGR Engineering Final MRUSSO Continued Entered by MRUSSO1 - PROVIDE AN APPROVED PLAN FOR FINAL INSPECTION THAT SHOWS WHAT WAS CONSTRUCTED
05/02/2016 ENGR Engineering Final MRUSSO Continued Entered by MRUSSO1 - NO ACCESS, WILL RE-SCHEDULE
03/17/2016 ENGR Engineering Final MRUSSO1 Prior to Final Inspectn Entered by MRUSSO1 - 1) PROVIDE APPROVAL FOR ANY AND ALL CHANGES MADE TO THE SITE/GRADING PLAN FROM THE ENG OF RECORD 2) ADDRESS STORM DRAINAGE FROM SWALE AND ROOF DRAINS ALONG THE SOUTH SIDE OF BLDG 3) PER COT UDC, A MAIN ROOF DRAIN CAN NOT DUMP ONTO A SIDEWALK.