Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2016 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 07/18/2016 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONN1 |
Not ready for Inspection |
Entered by RLEDONN1 - PROVIDE AP INSTALL OF SWPPP CONTROLS TO LET SILT GO UNDER WATTEL . COMPLET INSTALL PER AP PLANS. |
| 07/07/2016 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 07/06/2016 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ON SITE ABOUT INSTALLING SWPPP CONTROLS. |
| 07/05/2016 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |