Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/07/2017 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/28/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS BEFORE CALLING ENGINEERING FINAL. |
| 10/10/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS ATTHIS TIME. |
| 04/29/2016 |
ENGR Engineering Final
|
RLEDONNE |
Denied |
Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS BEFOR CALLING FOR GRADING FINAL.SLOPES ON DRIVEWAY OVER 14% THE SLOPES ARE FROM 17.7% TO 19.7%.COMPLET ALL EROSION CONTROLS. COMPLET ALL AVTIVITYS ON PERMIT. |
| 12/07/2017 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/28/2017 |
ENGR Engineering Final
|
RLEDONN1 |
Not ready for Inspection |
Entered by RLEDONN1 - SEE NOTES ON 9027 ENGINEERING. |
| 06/28/2017 |
ENGR Engineering Final
|
RLEDONN1 |
Not ready for Inspection |
Entered by RLEDONN1 - |