Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP16-0011

Parcel: 116300260

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
12/07/2017 ENGR Engineering Final RLEDONNE Approved Entered by RLEDONN1 -
06/28/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS BEFORE CALLING ENGINEERING FINAL.
10/10/2016 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS ATTHIS TIME.
04/29/2016 ENGR Engineering Final RLEDONNE Denied Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS BEFOR CALLING FOR GRADING FINAL.SLOPES ON DRIVEWAY OVER 14% THE SLOPES ARE FROM 17.7% TO 19.7%.COMPLET ALL EROSION CONTROLS. COMPLET ALL AVTIVITYS ON PERMIT.
12/07/2017 ENGR Engineering Final RLEDONNE Approved Entered by RLEDONN1 -
06/28/2017 ENGR Engineering Final RLEDONN1 Not ready for Inspection Entered by RLEDONN1 - SEE NOTES ON 9027 ENGINEERING.
06/28/2017 ENGR Engineering Final RLEDONN1 Not ready for Inspection Entered by RLEDONN1 -