Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
02/08/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - Site locked
02/09/2017 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 -
04/23/2020 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - STILL UNDER CONSTRUCTION AND NEEDS TO BE RESCHEDULED FOR THE FINAL INSPECTION OF THE SITE, SEE THE LATEST COMMENT IN THIS INSPECTION FOR ISSUES THAT NEED TO BE ADDRESSED PRIOR TO SCHEDULING A FINAL INSPECTION.
02/08/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
08/03/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
07/13/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
06/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
06/16/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GATE LOCKED NO ONE ON SITE.
05/04/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
07/10/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Terry with Oden construction. Sidewalks installed are in compliance, with the exception of the fire access signs, The temporary gate, And the landing in the ramp at the basin. Note the ramp is less than 5% but does gain over 36 inches. There is one landscape area that has not been depressed as specified on the plans. The roadway for this site is only 19‘6" wide from inside of curb to inside of curb. Contractor is looking for an assurance release for lot seven
02/08/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - The site is locked no contact information was provided
10/17/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CREWS WORKING ON SITE WORK, LANDSCAPE WORK WILL BE STARTING NEXT WEEK AS WELL AS THE REMOVAL OF ALL EXCESS MATERIALS.
06/19/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - SITE INSPECTION AT THIS TIME TO LOOK OVER THE PLACEMENT OF THE FUTURE SIDEWALKS ON THE WEST SIDE OF THE SITE. I HAVE REMINDED THE CONTRACTOR THAT IF HE IS CREATING A CONCENTRATED FLOW WITH THE WATER FROM THE ROOF DRAINAGE HE WILL NEED TO MAKE SURE THAT IT DOES NOT FLOW DIRECTLY ONTO THE SIDE WALKS. I HAVE ASKED THAT HE CONTACT THE ENGINEER OF RECORD FOR THIS SITE(CYPRUS) AND HAVE THE PROVIDE US WITH A DRAWING ON HOW THEY ARE PLANNING TO ROUTE THE LOCAL DRAINAGE.
05/17/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
05/07/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING AT THIS TIME.
09/13/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
09/05/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
08/30/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
07/31/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
07/06/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GATE LOCKED NO ACTIVITY ON SITE.
04/11/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
03/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
03/13/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
03/06/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GATE LOCKED NO ONE ON SITE.
03/01/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GATE LOCKED NO ONE ON SITE.
06/19/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR NEEDS TO HAVE THE ENGINEER OF RECORD ADDRESS HOW THE ROOF DRAINAGE IS TO CROSS THE PEDESTRIAN PATHWAY ON THE WEST SIDE OF THE PROPERTY. ALSO THEY NEED TO MAKE SURE THAT THIS DISCHARGE DOES NOT CREATE ANOTHER ISSUE WITH THE WESTERN NEIGHBORHOOD ASSOCIATION SINCE IT IS BEING DEPOSITED DIRECTLY INTO THEIR BACK YARDS.
01/02/2024 ENGR Grading Final Passed In process