Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP16-0008
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2021 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VLEON1 - |
02/08/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - No issues visible from the entrance gate. Jobsite locked. |
12/21/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Walk site with GC when over Basin at North End of site call Dave back in on Wednesday the 26th. |
10/17/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME, SITE STAYING CLEAN. |
08/14/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TREACK OUT AT THIS TIME. |
07/26/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
06/19/2018 | SITE - Stormwater Follow-up | DROBERTS | Correction Required | Entered by DROBERT5 - THE SITE NEEDS TO BE MONITORED BY THE CONTRACTOR TO ENSURE THAT THEY ARE NOT VIOLATING THE STORMWATER ORDINANCE. CURRENTLY THEY HAVE BEEN DEPOSITING CONCRETE THROUGHOUT THE SITE WHEN THEY HAVE COMPLETED THE PALCEMENT. I HAVE DIRECTED THEM TO MAKE SURE THAT ALL OF THE CONCRETE IS CLEANED UP AT THIS AND TO MAKE SURE THAT THERE IS NO VIOLATIONS LIKE THIS IN THE FUTURE. |
06/15/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - DROVE THROUGH THE SITE AND FIND NO CONCERNS AT THIS TIME. I WILL INSPECT THE SITE EARLY NEXT WEEK TO MAKE SURE THAT IT IS READY FOR THE MONSOON RAINS THIS SEASON. |
05/14/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - REPAIRS HAVE BEEN MADE. |
05/07/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS. |
04/18/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
04/11/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
03/15/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
03/12/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
02/20/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
02/12/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING A WASH OUT AND WENT OVER BASIN. |
02/01/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - REPAIRS HAVE BEEN MADE TO SWPPP. |
01/30/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP REPAIRS THAT STILL HAVE NOT BEEN DONE. |
01/24/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT SWPPP REPAIRS. |
01/08/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS. |
12/28/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
12/14/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP REPAIRS. |
11/21/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME |
11/15/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/27/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/24/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - no concerns at this time. |
10/16/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/11/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
09/22/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
09/19/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH NEW SUPER ON SITE WENT OVER SWPPP CONTROLS. |
08/14/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT. |
08/07/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN ADDED AT NORTH WEST END OF SITE. |
07/25/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE NEEDS REPAIRS TO SWPPP CONTROLS ON WEST SIDE OF SITE. |
04/26/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
03/06/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |