Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/18/2016 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE SITE TO SEE WHAT WILL BE HAPPENING IN THE NEAR FUTURE. THIS IS A SITE FOR A SINGLE FAMILY RESIDENCE, THREE ADDITIONAL HOMES WILL BE CONSTRUCTED IN THE FUTURE FOR THIS SMALL SUBDIVISION. I HAVE POINTED OUT THAT THERE IS CONCERN WITH THE NEIGHBORS THAT THE NPPO IS NOT BEING LOOKED AT BY THE DEVELOPER AND THEY ARE AFRAID THAT THE NATIVE CACTUS WILL BE DAMAGED DURING CONSTRUCTION. THE CREWS WILL START CLEARING SOME OF THE MATERIAL FROM THE SITE AND WILL WRAP PROTECTIVE FENCING MATERIAL AROUND ALL THE PLANTS THAT ARE TO BE SAVED DURING THE CONSTRUCTION OF THE HOME. I DISCUSSED THE ISSUES ALSO WITH THE ENGINEER OF RECORD WHO IS PAUL PZOMO. HE IS AWARE OF THE REQUIREMENTS FOR THE NPPO AND WILL MAKE SURE THAT THE DEVELOPER ADHERES TO THE REQUIREMENTS. |