Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2020 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by DROBERT5 - |
| 04/22/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RSALDAT1 - |
| 07/05/2017 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DROBERT5 - CONTRACTOR IS NOT READY AT THIS TIME BUT CONTINUES TO WORK ON COMPLETING ALL THE SMALL DETAIL WORK. |
| 05/17/2017 |
ENGR Engineering Final
|
DROBERT5 |
Continued |
Entered by DROBERT5 - GENERAL SITE CLEANUP IS REQUIRED BEFORE THIS SITE CAN BE FULLY APPROVED. SEE ALSO THE COMMENTS IN THE LANDSCAPE AND ENGINEERING ITEMS FOR A LIST OF ITEMS THE NEED TO BE ADDRESSED. ALSO PROVIDE REVISED APPROVED DRAWINGS AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD PRIOR TO SCHEDULING FOR A FINAL INSPECTION. |
| 01/18/2017 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DROBERT5 - SEE THE PREVIOUS COMMENTS PRIOR TO CALLING IN THE FINAL. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS. |
| 12/30/2016 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - PROVIDE DETAILS AND DIMENSIONS OF FOOTING AND RE-ENFORCEMENT FOR RETAINING WALL SHOWN ON THE APPROVED PLAN ( SIZE OF RE-BAR, FOOTING SIZE, DISTANCE BETWEEN VERTICLES...), CALL FOR RE-INSPECTION |
| 07/05/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 05/17/2017 |
ENGR Engineering Final
|
DROBERT5 |
Continued |
Entered by DROBERT5 - REVISE THE DRAWINGS FOR THIS SITE BEFORE CALLING IN FOR THE FINAL INSPECTIONS. |
| 01/18/2017 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DROBERT5 - SEE THE PREVIOUS COMMENTS PRIOR TO CALLING IN THE FINAL |
| 10/26/2016 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) ENSURE SITE WORK/LANDSCAPING IS COMPLETED PER THE APPROVED PLANS
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD FOR SUBSTANTIAL COMPLETION AND CHANGES MADE. |