Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/12/2016 |
ENGR Grading Final |
RLEDON |
Approved |
Entered by KROBLES1 - |
| 10/24/2016 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) LOOKED AT FORMS FOR SIDEWALKS AROUND BLDG. - OK
2) ENSURE SCUPPERS ARE INSTALLED AT ROOF DRAINS
3) ENSURE PEDESTRIAN ACCESS IS INSTALLED PER APPROVED PLANS |
| 09/09/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - THE BUILDING PAD HAS BEEN CONSTRUCTED AT THIS TIME AND THE CREWS ARE WORKING ON THE UTILITY INSTALLATION, PREPPING FOR THE FORMING OF THE SLAB. |
| 12/12/2016 |
ENGR Grading Final |
RLEDON |
Approved |
Entered by KROBLES1 - |
| 11/21/2016 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by MRUSSO1 - TRASH ENCLOSURE WALLS, BOLLARDS INSTALLED PER APPROVED PLANS - OK |
| 11/15/2016 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by MRUSSO1 - INSPECTED RE-BAR LAY OUT, BOLLARDS AND WALL FOOTINGS FOR TRASH ENCLOSURE - INSTALLED PER APPROVED PLANS, OK TO POUR CONCRETE |
| 12/13/2016 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 12/12/2016 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by KROBLES1 - |
| 12/13/2016 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 12/12/2016 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by KROBLES1 - |