Permit: DP15-0203

Parcel: Unknown

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
11/04/2016 SITE - Stormwater Follow-up MRUSSO Approved Entered by MRUSSO1 -
10/31/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/05/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - 1) INSPECTED COVER OVER CULVERT PIPES, HAND FORMED CONCRETE INSTALLED PER PLAN - PICTURES TAKEN 2) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH PERIMETER
07/01/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - 1) ITS REQUIRED DURING CONSTRUCTION WITH IN THE CITY OF TUCSON TO ENSURE DISTURBED SOIL IS KEPT ON SITE USING ACCEPTABLE MEANS; PER COT STORM WATER ORDINANCE. 2) RECOMMEND INSTALL OF SEDIMENT CONTROLS ALONG NORTH PERIMETER DURING CONSTRUCTION DUE TO SOIL RUN OFF. 3) INSPECTED CULVERT PIPE SHOWN ON APPROVED REVISION - INSTALLED PER PLAN 4) CALL FOR INSPECTION AFTER CONCRETE IS POURED PRIOR TO COVER
05/10/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME