Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/05/2019 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/12/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - PRELIMINARY INSPECTION OF CONSTRUCTION SITE:
1) ENSURE YOUR IN COMPLIANCE WITH YOUR STORM WATER PLAN AND PERMIT. IMPLEMENT SWPPP CONTROLS PRIOR TO CONSTRUCTION
2) POST A COPY OF YOUR NOI AT THE SITE ENTRANCE
3) SWEEP UP TRACKED SOIL
4) INSTALL AND USE A CONCRETE WASH OUT AS NEEDED
5) CALL FOR INSPECTION FOR ANY STORM WATER, SITE, GRADING OR LANDSCAPING ISSUES AND/OR CONCERNS.
6) CALL FOR INSPECTION FRO ANY CHANGES TO THE APPROVED PLANS
7) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM PIPE |