Permit: DP15-0185

Parcel: 12310001J


Addresses:

1501 N CAMPBELL AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP15-0185

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/09/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
04/09/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
07/22/2016 ENGR Grading Final MRUSSO Correction Required Entered by MRUSSO1 - CHANGES MADE TO THE SITE NOT SHOWN ON THE APPROVED PLANS, TO INCLUDE BUT NO LIMITED TO THE FOLLOWING: 1) CONTRACTOR CONNECTING ROOF DRAINS FROM TWO EXISTING BLDGS TO INSTALLED 42" RCP STORM DRAIN LINE. NO DETAILS ON MATERIALS USED, SIZE OF PIPE OR CONNECTION REQUIREMENTS. NOT SHOWN ON PLANS. 2) RE-BAR REQUIRED FOR STORM DRAINAGE STRUCTURES. INSPECTIONS ARE REQUIRED FOR RE-BAR LAY-OUT PRIOR TO CONCRETE. NOT SHOWN ON PLANS 3) PROVIDE SPECS AND LEAK TESTING RESULTS FOR RCP UNDER BLDG. 4) CHANGE TO MANHOLE NEAR RING ROAD ON NORTH SIDE OF SITE. MANHOLE SHOWN ON PLANS, CATCH BASIN WAS INSTALLED OUT IN THE FIELD. 5) NEED CITY APPROVED REVISION SHOWING CHANGES MADE 6) NEED CERTIFICATION FROM THE ENG OF RECORD 7) NEED AS-BUILT SHOWING WHAT WAS CONSTRUCTED. 8) NEED TO BE CALLED OUT FOR INSPECTION FOR INSTALL OF STORM PIPE AND SITE WORK.
12/24/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/15/2020 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - PORTION OF THIS SITE HAS NOT BEEN COMPLETED(BASINS) AND ARE STILL UNDER CONSTRUCTION. ALSO THE WEST SIDE OF THE NEW HOSPITAL NEW PARKING AREA IS BEING UTILIZED AS A TEMPORARY CONSTRUCTION YARD FOR ADDITIONAL PERMITS. A FINAL IS NOT TO BE GIVEN FOR THIS SITE TILL ALL OF THE WORK FOR EACH PERMIT IS COMPLETED, INSPECTED, AND APPROVED. NOTES FROM THE PREVIOUS INSPECTIONS: THE WORK FOR THIS SITE IS COMPLETE AT THIS TIME EXCEPT IN THE AREAS OF THE BASINS AND THE WEST SIDE PARKING AREA. THIS PERMIT WILL REMAIN OPEN TILL ALL OF THE WORK FOR THE ISTE IS COMPLETED AND ALL CONSTRUCTION MATERIAL AND EQUIPMENT HAS BEEN REMOVED FROM THE TEMPORARY CONSTRUCTION YARD. THIS SITE MIGHT CONSIDER TASKING OUT ANOTHER PERMIT FOR THE AREAS THAT ARE NOT COMPLETE AT THIS TIME AND MOVE ALL REMAINING ITEMS TO BE COMPLETED UNDER THE NEW PERMIT.
01/30/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CREWS CONTINUE TO WORK ON THE SITE MAINLY WITHIN THE PERIMETERS OF THE STRUCTURE. I WALKED THE AREAS AROUND THE STRUCTURE TO SEE WHAT IS HAPPENIING, MINOR AREAS OF PONDING WATER HAVE BEEN NOTED, THESE ARE SMALL AND VERY LIMITED FOR PONDING. REMINDED TO CONTRACTOR TO CONTINUE WITH THE STORMWATER CHECKS AFTER EACH RAIN EVENT. I WILL RECHECK THE WADDLE REPLACEMENT AFTER THE EXCHANGE HAS BEEN MADE.
01/25/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CONTRACTOR WORKING ON THE WATER DIVERTORS ON THE SITE, SHOULD BE POURING THESE THE FIRST PART OF NEXT WEEK. WILL GET WITH JIM BURGE AND SEE IF HE NEEDS ANY HELP.
07/22/2016 ENGR Grading Final MRUSSO Correction Required Entered by MRUSSO1 - CHANGES MADE TO THE SITE NOT SHOWN ON THE APPROVED PLANS, TO INCLUDE BUT NO LIMITED TO THE FOLLOWING: 1) CONTRACTOR CONNECTING ROOF DRAINS FROM TWO EXISTING BLDGS TO INSTALLED 42" RCP STORM DRAIN LINE. NO DETAILS ON MATERIALS USED, SIZE OF PIPE OR CONNECTION REQUIREMENTS. NOT SHOWN ON PLANS. 2) RE-BAR REQUIRED FOR STORM DRAINAGE STRUCTURES. INSPECTIONS ARE REQUIRED FOR RE-BAR LAY-OUT PRIOR TO CONCRETE. NOT SHOWN ON PLANS 3) PROVIDE INSTALLATION SPECS AND LEAK TESTING RESULTS FOR RCP UNDER BLDG. 4) CHANGE TO MANHOLE NEAR RING ROAD ON NORTH SIDE OF SITE. MANHOLE IS SHOWN ON PLANS, CATCH BASIN WAS INSTALLED OUT IN THE FIELD. 5) NEED CITY APPROVED REVISION SHOWING CHANGES MADE 6) NEED CERTIFICATION FROM THE ENG OF RECORD 7) NEED AS-BUILT SHOWING WHAT WAS CONSTRUCTED. 8) NEED TO BE CALLED OUT FOR INSPECTION IN ORDER TO VERIFY INSTALL OF STORM PIPE AND SITE WORK.
07/21/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - 1) ANY SIGNIFICANT CHANGES TO THE SITE MUST BE SHOWN ON THE APPROVED PLANS AND BE APPROVED BY THE CITY OF TUCSON AND THE ENGINEER OF RECORD 2) PLEASE CALL IN FOR INSPECTION/VERIFICATION OF INSTALL OF STORM WATER PIPING - TO INCLUDE CATCH BASINS, MANHOLES, ROOF DRAIN TIE-IN'S AND MAJOR CHANGES OF DIRECTION 3) PLEASE GIVE A POINT OF CONTACT FOR THE INSPECTION CALLED IN FOR THAT DAY. 3) DUE TO THE FACT THAT INSTALLATION OF SECTIONS OF PIPE AND DRAINAGE STRUCTURES WERE NOT VERIFIED OR INSPECTED - CONTRACTOR MUST PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD AND AN AS-BUILT DRAWING SHOWING CHANGES MADE.
07/07/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - 1) LO0KED AT SECTION OF 42" RCP INSTALL ALONG THE EMERGENCY ROOM AREA, OK TO COVER - PICTURES TAKEN 2) CALL FOR INSPECTION FOR ANY LATERAL STORM PIPE CONNECTION OR MANHOLE OR CATCH BASIN CONSTRUCTION PRIOR TO COVER
05/16/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - 1) MANHOLE #3 POURED , CONTRACTOR WORKING ON FORMING MANHOLE#4. 2) PICTURES TAKEN OF RE-BAR LAYOUT
05/13/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - 1) INSTALL OF 42" RCP AND CONSTRUCTION OF MANHOLES #3 AND 4. 2) PICTURES TAKEN, PIPED FPRMED W/#6 RE-BAR ABOVE AND BELOW EACH PIPE. 3) FOLLOW UP INSPECTION REQUIRED COT/PC STD DETAIL 300
05/06/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - 1) LOOKED AT INSTALL OF 42" RCP STORM PIPE BETWEEN MANHOLE #5 AND #4 - PIPE INSTALLED PER PLAN, OK TO COVER 2) LOOKED AT INTERIM STORM WATER BASIN 3) ENSURE COMPLIANCE WITH YOUR SWPPP PICTURES TAKEN
05/05/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - 1) LOOKED AT INSTALL OF 42" RCP ALONG ROADWAY TO ENTRANCE TO EMERG BLDG. INSTALL PER PLAN - OK 2) LOOKED AT BLDG PAD FOR HOSP BLDG
02/25/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - FOLLOW UP ON ELECTRICAL CONDUIT INSTALLATION. LOOKED AT ROAD CROSSING , INSTALLED PER PLAN- OK TO COVER.
02/24/2016 ENGR Grading Final MRUSSO Continued Entered by MRUSSO1 - CONTRACTOR INSTALLING APPROXIMATELY 50' OF ELECTRICAL CONDUIT AT THE ROAD CROSSING INTO THE EM VAULT. INSTALLATION PER PLAN, TOOK PICS - OK TO COVER
02/16/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE UNDERGROUND SECTION OF PIPE IN THE UTILITY TRENCHES ON SHEET AND . THE PIPE HAS BEEN APPROVED FOR THE PLACEMENT OF CONCRETE OVER THE PIPES IN THE AREA AS NOTED ON THE APPROVED CONTRACTORS PLANS PAGE CU10 KEYNOTE 100
12/24/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/28/2020 ENGR Grading Final DROBERTS Continued Entered by JSCHNEI2 - CONTINUED AT THIS TIME, MOST OF THE WORK APPEARS TO HAVE BEEN COMPLETED BUT HAS NOT BEEN INSPECTED FOR THE FINALS. THE CONTRACTOR NEEDS TO REMOVE ALL EXCESS CONSTRUCTION TRAILERS LOCATED IN THE PARKING ON THE LOT WEST OF THIS SITE PRIOR TO SCHEDULING THIS FINAL INSPECTION FOR THE WEST SIDE AND ALL BASINS ON THE NORTH AND EAST SIDE OF THIS SITE.
04/09/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -