Inspection History: SITE - Stormwater Follow-up

Permit Number - DP15-0185

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
12/24/2020 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 -
01/15/2020 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - THE WORK FOR THIS SITE IS COMPLETE AT THIS TIME EXCEPT IN THE AREAS OF THE BASINS AND THE WEST SIDE PARKING AREA. THIS PERMIT WILL REMAIN OPEN TILL ALL OF THE WORK FOR THE ISTE IS COMPLETED AND ALL CONSTRUCTION MATERIAL AND EQUIPMENT HAS BEEN REMOVED FROM THE TEMPORARY CONSTRUCTION YARD. THIS SITE MIGHT CONSIDER TASKING OUT ANOTHER PERMIT FOR THE AREAS THAT ARE NOT COMPLETE AT THIS TIME AND MOVE ALL REMAINING ITEMS TO BE COMPLETED UNDER THE NEW PERMIT.
04/09/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME
04/05/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
01/30/2017 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME. THE CREW WILL BE REPLACING THE DAMAGED WADDLE AS NEEDED THROUGHOUT THE SITE.
07/21/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS ATHIS TIME
05/16/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME
05/13/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
05/06/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - 1) LOOKED AT INSTALL OF 42" RCP STORM PIPE BETWEEN MANHOLE #5 AND #4 - PIPE INSTALLED PER PLAN, OK TO COVER 2) LOOKED AT INTERIM STORM WATER BASIN 3) ENSURE COMPLIANCE WITH YOUR SWPPP PICTURES TAKEN
05/05/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - SITE IS UNDER A STORM WATER PERMIT, ENSURE COMPLIANCE WITH YOUR SWPPP
03/15/2016 SITE - Stormwater Follow-up MRUSSO1 Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/29/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
02/24/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/16/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THE STORMWATER CONTROLS AND SITE TRACK OUT. SEE THE PREVIOUS NOTES FOR 09150 ENGINEERING INSPECTION FOR ALL CONCERNS THAT ARE STILL NEEDING TO BE ADDRESSED.