Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP15-0185
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/24/2020 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
01/15/2020 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - THE WORK FOR THIS SITE IS COMPLETE AT THIS TIME EXCEPT IN THE AREAS OF THE BASINS AND THE WEST SIDE PARKING AREA. THIS PERMIT WILL REMAIN OPEN TILL ALL OF THE WORK FOR THE ISTE IS COMPLETED AND ALL CONSTRUCTION MATERIAL AND EQUIPMENT HAS BEEN REMOVED FROM THE TEMPORARY CONSTRUCTION YARD. THIS SITE MIGHT CONSIDER TASKING OUT ANOTHER PERMIT FOR THE AREAS THAT ARE NOT COMPLETE AT THIS TIME AND MOVE ALL REMAINING ITEMS TO BE COMPLETED UNDER THE NEW PERMIT. |
04/09/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME |
04/05/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
01/30/2017 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. THE CREW WILL BE REPLACING THE DAMAGED WADDLE AS NEEDED THROUGHOUT THE SITE. |
07/21/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS ATHIS TIME |
05/16/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME |
05/13/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
05/06/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) LOOKED AT INSTALL OF 42" RCP STORM PIPE BETWEEN MANHOLE #5 AND #4 - PIPE INSTALLED PER PLAN, OK TO COVER 2) LOOKED AT INTERIM STORM WATER BASIN 3) ENSURE COMPLIANCE WITH YOUR SWPPP PICTURES TAKEN |
05/05/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - SITE IS UNDER A STORM WATER PERMIT, ENSURE COMPLIANCE WITH YOUR SWPPP |
03/15/2016 | SITE - Stormwater Follow-up | MRUSSO1 | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
02/29/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
02/24/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
02/16/2016 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THE STORMWATER CONTROLS AND SITE TRACK OUT. SEE THE PREVIOUS NOTES FOR 09150 ENGINEERING INSPECTION FOR ALL CONCERNS THAT ARE STILL NEEDING TO BE ADDRESSED. |