Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP15-0185

Parcel: 12310001J


Addresses:

1501 N CAMPBELL AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP15-0185

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/05/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
07/25/2016 ENGR Engineering Final MRUSSO Continued Entered by MRUSSO1 - CHANGES MADE TO THE SITE NOT SHOWN ON THE APPROVED PLANS, TO INCLUDE BUT NO LIMITED TO THE FOLLOWING: 1) CONTRACTOR CONNECTING ROOF DRAINS FROM TWO EXISTING BLDGS TO INSTALLED 42" RCP STORM DRAIN LINE. NO DETAILS ON MATERIALS USED, SIZE OF PIPE OR CONNECTION REQUIREMENTS. NOT SHOWN ON PLANS. 2) RE-BAR REQUIRED FOR STORM DRAINAGE STRUCTURES. INSPECTIONS ARE REQUIRED FOR RE-BAR LAY-OUT PRIOR TO CONCRETE. NOT SHOWN ON PLANS 3) PROVIDE INSTALLATION SPECS AND LEAK TESTING RESULTS FOR RCP UNDER BLDG. 4) CHANGE TO MANHOLE NEAR RING ROAD ON NORTH SIDE OF SITE. MANHOLE IS SHOWN ON PLANS, CATCH BASIN WAS INSTALLED OUT IN THE FIELD. 5) NEED CITY APPROVED REVISION SHOWING CHANGES MADE 6) NEED CERTIFICATION FROM THE ENG OF RECORD 7) NEED AS-BUILT SHOWING WHAT WAS CONSTRUCTED. 8) NEED TO BE CALLED OUT FOR INSPECTION IN ORDER TO VERIFY INSTALL OF STORM PIPE AND SITE WORK.
12/24/2020 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
04/09/2019 ENGR Engineering Final DROBERTS Continued Entered by DROBERT5 - WALKED THE SITE TO SEE WHAT TYPE OF WORK IS NECESSARY FOR THE PERMIT TO BE FINALED. MOST OF THE WORK AROUND THE BUILDING HAS BEEN COMPLETED EXCEPT FOR THE GRADING AND LANDSCAPING, AND THIS IS AT APPROXIMATELY 95%. IN THE AREAS OF THE BASIN NORTH AND EAST OF THE HOSPITAL THAT WORK IS BETWEEN 70% - 90%. TO COMPLETE THE REST OF THIS WORK THE CONTRACTOR IS ANTICIPATING THAT THIS WORK WILL BE COMPLETED IN APPROXIMATELY 5 MONTHS AT THE LATEST. ALSO THE CONTRACTOR HAS BEEN AUTHORIZED BY THE CITY AND BANNER TO UTILIZE THE SOUTHERN PARKING AREA ON THE WEST SIDE OF THE NEW HOSPITAL FOR STAGING AND AS A CONSTRUCTION YARD FOR THE NEXT 12 MONTHS. THIS WILL REQUIRE THAT THIS PERMIT REMAINS OPEN THROUGH THE DURATION OR TILL AN ADDITIONAL PERMIT HAS BEEN ISSUED TO COVER ALL OF THE EXTERIOR AREAS THAT WILL BE AFECTED BY THE UPCOMING WORK.
07/22/2016 ENGR Engineering Final MRUSSO Prior to Final Inspectn Entered by MRUSSO1 - CHANGES MADE TO THE SITE NOT SHOWN ON THE APPROVED PLANS, TO INCLUDE BUT NO LIMITED TO THE FOLLOWING: 1) CONTRACTOR CONNECTING ROOF DRAINS FROM TWO EXISTING BLDGS TO INSTALLED 42" RCP STORM DRAIN LINE. NO DETAILS ON MATERIALS USED, SIZE OF PIPE OR CONNECTION REQUIREMENTS. NOT SHOWN ON PLANS. 2) RE-BAR REQUIRED FOR STORM DRAINAGE STRUCTURES. INSPECTIONS ARE REQUIRED FOR RE-BAR LAY-OUT PRIOR TO CONCRETE. NOT SHOWN ON PLANS 3) PROVIDE INSTALLATION SPECS AND LEAK TESTING RESULTS FOR RCP INSTALLED UNDER THE BLDG. 4) CHANGE TO MANHOLE NEAR RING ROAD ON NORTH SIDE OF SITE. MANHOLE SHOWN ON PLANS, CATCH BASIN WAS INSTALLED OUT IN THE FIELD. 5) NEED CITY APPROVED REVISION SHOWING CHANGES MADE 6) NEED CERTIFICATION FROM THE ENG OF RECORD 7) NEED AS-BUILT SHOWING WHAT WAS CONSTRUCTED. 8) NEED TO BE CALLED OUT FOR INSPECTION FRO INSTALL OF STORM PIPE AND SITE WORK.
07/21/2016 ENGR Engineering Final MRUSSO Continued Entered by MRUSSO1 - 1) ANY SIGNIFICANT CHANGES TO THE SITE MUST BE SHOWN ON THE APPROVED PLANS AND BE APPROVED BY THE CITY OF TUCSON AND THE ENGINEER OF RECORD 2) PLEASE CALL IN FOR INSPECTION/VERIFICATION OF INSTALL OF STORM WATER PIPING - TO INCLUDE CATCH BASINS, MANHOLES, ROOF DRAIN TIE-IN'S AND MAJOR CHANGES OF DIRECTION 3) PLEASE GIVE A POINT OF CONTACT FOR THE INSPECTION CALLED IN FOR THAT DAY. 3) DUE TO THE FACT THAT INSTALLATION OF SECTIONS OF PIPE AND DRAINAGE STRUCTURES WERE NOT VERIFIED OR INSPECTED - CONTRACTOR MUST PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD AND AN AS-BUILT DRAWING SHOWING CHANGES MADE.