Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 04/05/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 12/24/2020 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/15/2020 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Continued |
Entered by DROBERT5 - THE WORK FOR THIS SITE IS COMPLETE AT THIS TIME EXCEPT IN THE AREAS OF THE BASINS AND THE WEST SIDE PARKING AREA. THIS PERMIT WILL REMAIN OPEN TILL ALL OF THE WORK FOR THE ISTE IS COMPLETED AND ALL CONSTRUCTION MATERIAL AND EQUIPMENT HAS BEEN REMOVED FROM THE TEMPORARY CONSTRUCTION YARD.
THIS SITE MIGHT CONSIDER TASKING OUT ANOTHER PERMIT FOR THE AREAS THAT ARE NOT COMPLETE AT THIS TIME AND MOVE ALL REMAINING ITEMS TO BE COMPLETED UNDER THE NEW PERMIT. |
| 04/09/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Continued |
Entered by DROBERT5 - LANDSCAPING IS AT ABOUT 90% AT THIS TIME, FINAL WORK TO BE COMPLETED OVER THE NEXT 3 MONTHS. A FINAL RE-INSPECTION OF THE SITE WILL BE NEEDED PRIOR TO THE FINAL APPROVAL. |