Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/17/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/07/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 03/29/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - LOOKED AT INSTALL OF HEAD WALL AT CULVERT PIPES ALONG ENTRANCE TO THE SITE IN THE DRAINAGE - PARTIAL APPROVAL OK TO POUR CONCRETE |
| 03/27/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) FORMS FOR HEAD WALL INSTALLED
2) STEEL IN PLACE FOR CULVERT GROUTING |
| 03/17/2017 |
ENGR Grading Final |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - RE-BAR LAY OUT AND FOOTINGS INSTALLED PER APPROVED PLANS- OK TO POUR CONCRETE |
| 03/13/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - LOOKED AT FOOTINGS AND RE-BAR LAY OUT FOR NEW HEAD WALL IN DRAINAGE AT ENTRANCE - INSTALLED PER PLAN |
| 04/12/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/12/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/07/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - LOOKED AT ENTRANCE TO GAS STATION. |
| 02/28/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) THIS SITE IS UNDER A STORM WATER PERMIT UNTIL THE SITE IS 100% STABILIZED.
2) ENSURE PEDESTRIAN ACCESS AND HC PARKING MEET ADA REQUIREMENTS
3) PROVIDE A CERT FROM THE ENG OF RECORD PER THE APPROVED PLANS
4) PROVIDE THE LATEST REVISED PLAN FOR FINAL GRADING INPECTION |
| 02/15/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SOME CURBING DONE
2) DRAINAGE/SUB GRADE ROUGHED IN
NO SIGNIFICANT SITE WORK AT THIS TIME |