Permit: DP15-0173

Parcel: 141220280


Addresses:

9255 S RITA RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP15-0173

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/19/2017 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, SEE OTHER COMMENTS MADE ON THIS INSPECTION TO OTHER ITEMS.
05/01/2017 ENGR Engineering Final MRUSSO Partial Approval Entered by DROBERT5 - 1) COMPLETE ALL SITE/GRADING/LANDSCAPING 2) CALL FOR FINAL INSPECTION 3) PROVIDE FINAL REVISED PLAN 4) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 5) SEPARATE ANY REMAINING CONSTRUCTION FROM THE PUBLIC
05/24/2017 ENGR Engineering Final MRUSSO Approved Entered by DROBERT5 -
05/19/2017 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - I WALKED THIS SITE TO SEE IF IT IS READY FOR THE FULL RELEASE OF THE ASSURANCES, IT IS NOT COMPLETE AT THIS TIME. THE FOLLOWING ITEMS WILL NEED TO BE FULL LOOKED AT PRIOR TO THIS SITE BEING FUKLLY RELEASED: 1) THE APPROVED TENTATIVE PLAT SHOWS THAT THE TWO BASINS ARE TO HAVE ACCESS GATES INSTALLED AT THE ENTRANCES ON THE ENDS ADJACENT TO 22ND STREET. ON THE WESTERN BASINS POST HAVE BEEN POURED AT THE ENTRANCE AND CABLE HAS BEEN STRUNG BETWEET THE POST. AT THIS LOCATION THE WESTERN MOST POST IS LOOSE IN THE SET AND CAN BE REMOVED OR PULLED OVER WITH LITTLE EFFORT. THIS POST AND MAYBE OTHERS WILL NEED TO HAVE THE FOUNDATIONS POURED AGAIN SO THAT THEY ARE SECURE AND STABLE. 2) ON THE SOUTH END OF THE EASTERN BASIN THE POST HAVE BEEN THE FOUDATIONS POURED, BUT THERE ARE NO CABLES PROVIDED TO PREVENT ACCESS INTO THE BASIN, ALSO THE EASTERN WALL OF THE BASIN HAS NOT BEE INSTALLED AT THIS TIME. 3) THE FULL SITE WILL NEED TO HAVE A FULL INSPECTION TO ENSURE THAT THERE HAVE BEEN NO CHANGES MADE THAT ARE NOT REFLECTED ON THE APPROVED PLANS. 4) THE LANDSCAPE ON THIS SITE WILL NEED TO BE LOOKED AT SINCE SOME OF THE NPPO PLANTS HAVE EITHER BEEN DESTROYED, DIED, OR HAVE BEEN STOLEN DURING THE DELAY IN THE START OF THE PROJECT. A REVISED APPROVED DRAWINGS NEED TO BE PROVIDED FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO SOME OF THE PLANTS AND THE TREES APPEAR TO HAVE DIED SINCE THEY WERE ORIGINALLY INSTALLED, VERIFICATION OF THE A WORKING IRRIGATION WILL BE NEED PRIOR TO THE FULL APPROVAL OF THIS SITE.
04/13/2017 ENGR Engineering Final MRUSSO Prior to Final Inspectn Entered by DROBERT5 - 1) CONSTRUCT THE SITE PER THE APPROVED PLANS (TO INCLUDE CURBING) OR PROVIDE AN APPROVED PLAN THAT SHOWS WHAT YOU CONSTRUCTED. 2) ALL AREAS DISTURBED BY CONSTRUCTION MUST BE STABILIZED; WITH ROCK OR HYDROSEED, PRIOR TO FINAL APPROVAL - PER COT DEV STD 11. 3) PROVIDE A CERT. STATEMENT FROM THE ENG OF RECORD.
02/28/2017 ENGR Engineering Final MRUSSO Prior to Final Inspectn Entered by DROBERT5 - 1) THIS SITE IS UNDER A STORM WATER PERMIT UNTIL THE SITE IS 100% STABILIZED. 2) ENSURE PEDESTRIAN ACCESS AND HC PARKING MEET ADA REQUIREMENTS 3) PROVIDE A CERT FROM THE ENG OF RECORD PER THE APPROVED PLANS 4) PROVIDE THE LATEST REVISED PLAN FOR FINAL GRADING INPECTION