Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/23/2020 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/10/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by MRUSSO1 - SITE IS NOT IN COMPLIANCE WITH THIER SWPPP.
NO PRE-CON MEETING CALLED FOR ENGINEERING.
1) RE-ESTABLISH AND RE-INSTALL SEDIMENT CONTROLS PER YOUR SWPPP.
2) PROVIDE COPIES OF YOUR STORM WATER SELF INSPECTIONS.
3) PROVIDE AN APPROVED LANDSCAPE AND NPPO PLANS FOR INSPECTION.
4) INSTALL A CONCRETE WASH OUT PER YOUR SWPPP.
5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD AT FINAL
CALL FOR RE-INSPECTION FOR COMPLIANCE |