Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP15-0165

Parcel: 99999999A


Addresses:

8820 E 21ST ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP15-0165

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/23/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/23/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/23/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/23/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
02/28/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - STILL WAITING FOR THE WALLS TO BE CONSTRUCTED IN THE BASIN AREAS, AND THE COMPLETE INSTALLATION OF THE BOLLARDS AND CHAINS
05/18/2017 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - I WALKED THIS SITE TO SEE IF IT IS REAFY FOR THE FULL RELEASE OF THE ASSURANCES, IT IS NOT COMPLETE AT THIS TIME. THE FOLLOWING ITEMS WILL NEED TO BE REINSPECTED PRIOR TO THIS SITE BEING FULLY RELEASED: 1) THE APPROVED TENTATIVE PLAT SHOWS THAT THE TWO BASINS ARE TO HAVE ACCESS GATES INSTALLED AT THE ENTRANCES ON THE ENDS ADJACENT TO 22ND STREET. ON THE WESTERN BASINS POST HAVE BEEN POURED AT THE ENTRANCE AND CABLE HAS BEEN STRUNG BETWEET THE POST. AT THIS LOCATION THE WESTERN MOST POST IS LOOSE IN THE SET AND CAN BE REMOVED OR PULLED OVER WITH LITTLE EFFORT. THIS POST AND MAYBE OTHERS WILL NEED TO HAVE THE FOUNDATIONS POURED AGAIN SO THAT THEY ARE SECURE AND STABLE. 2) ON THE SOUTH END OF THE EASTERN BASIN THE POST HAVE BEEN THE FOUDATIONS POURED, BUT THERE ARE NO CABLES PROVIDED TO PREVENT ACCESS INTO THE BASIN, ALSO THE EASTERN WALL OF THE BASIN HAS NOT BEE INSTALLED AT THIS TIME. 3) THE FULL SITE WILL NEED TO HAVE A FULL INSPECTION TO ENSURE THAT THERE HAVE BEEN NO CHANGES MADE THAT ARE NOT REFLECTED ON THE APPROVED PLANS. 4) THE LANDSCAPE ON THIS SITE WILL NEED TO BE LOOKED AT SINCE SOME OF THE NPPO PLANTS HAVE EITHER BEEN DESTROYED, DIED, OR HAVE BEEN STOLEN DURING THE DELAY IN THE START OF THE PROJECT. A REVISED APPROVED DRAWINGS NEED TO BE PROVIDED FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO SOME OF THE PLANTS AND THE TREES APPEAR TO HAVE DIED SINCE THEY WERE ORIGINALLY INSTALLED, VERIFICATION OF THE A WORKING IRRIGATION WILL BE NEED PRIOR TO THE FULL APPROVAL OF THIS SITE. 5) ENSURE THAT ALL THE EXTERIOR WALLS FOR THIS SITE HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS. CURRENTLY THE EASTERN WALL OF THE BASIN LOCATED AT THE SOUTHEAST CORNER OF THIS SUBDIVISION HAS ONLY BEEN PARTIALLY CONSTRUCTED AND WILL NEED TO BE FINISHED PRIOR TO A FINAL INSPECTION OF THIS SITE, THIS IS NOT TO BE CONSIDERED A FULL AND FINAL PUNCHLIST CONSIDERING ALL OF THE REMAINING WORK THAT IS STILL NEEDED. THE DEVELOPER OR CONTRACTOR WILL NEED TO PROVIDE APPROVED REVISED DRAWING FOR THIS SITE, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND THE NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY WHEN THE FINAL INSPECTION FOR THIS SITE IS SCHEDULED.