Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP15-0163

Parcel: 119310060

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/23/2020 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - SITE IS BEING APRROVED, THE LAST COMMENTS HAVE NOT BEEN ADDRESSED BY THIS DEPARTMENTBY THE OWNER OF THE SITE.
03/01/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS . OR PROVIDE AP CHANGES TO AP PLANS.
04/23/2020 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - SITE IS BEING APRROVED, THE LAST COMMENTS HAVE NOT BEEN ADDRESSED BY THIS DEPARTMENTBY THE OWNER OF THE SITE.
03/02/2017 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - PROVIDE CHANGES TO AP PLANS FOR BASIN AND DRAIN PIPIE.
03/01/2017 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 -