Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) CALL FOR INSPECTION FOR ANY CHANGES OR QUESTIONS CONCERNING GRADING/LANDSCAPING/STORM WATER.
2) PERFORM STORM WATER SELF INSPECTION PER YOUR SWPPP.
3) INSTALL STABILIZED CONSTRUCTION ENTRANCE
4) INSTALL SEDIMENT CONTROLS ALONG PUBLIC DRAINAGE
5) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE
6) SEDIMENT CONTROLS MAY NEED TO BE ADJUSTED BASED ON SITE SPECIFICS ARE CHANGING CONDITIONS |
| 01/12/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CALL IN FOR A PRE-CON MEETING PRIOR TO THE START OF CONSTRUCTION- OLEARY CONSTR (PAUL 240-2135)/KB HOMES (ERIC 250-5709).
2) IMPLEMENT STORM WATER CONTROLS AND REQUIREMENTS PRIOR TO CONSTRUCTION. |