Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/18/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 06/16/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE WAITING FOR COT AP AS-BUILTS. |
| 03/20/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC STILL WAITING FOR AS-BUILTS. |
| 02/03/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE WAITING FOR AP AS-BUILTS FROM COT. |
| 11/16/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - MET WITH GC ABOUT L- CERT CERT LETTER FOR ALL GRADING AND DRAINAGE. AND AS-BUILTS. |
| 10/03/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - PER TUCSON -TECHNICAL STANDARDS PEDESTRIAN ACCESS . PHYSICAL SEPARATION FROM TRAVEL LANE. STANDARDS (4.2.B) THE MAXIMUM SEPARRATION BETWEEN THE BARRIERS IS FIVE FEET CIEAR. |
| 07/18/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 07/12/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP REPAIR ON NORTH WEST SIDEOF SITE. |
| 01/26/2016 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - AP PLANS ON SITE AND NOI PICKED UP PRE-CON PACKET. |