Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 03/06/2019 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE FOR THIS SITE OR COMPLETE THE SITE PER THE ORIGINAL PLANS. PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND A N.O.T. FROM ADEQ FOR THE CLOSURE OF THE SITE STORMWATER PERMIT. |
| 08/04/2015 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 11/30/2023 |
ENGR Engineering Final
|
|
Passed |
signs appear to be on a photo-cell instead of timer. will check sign final inspection |