Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Final Inspection
Permit Number - DP15-0060
Inspection Description - SITE - Stormwater Final Inspection
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2019 | SITE - Stormwater Final Inspection | bbenedo1 | Approved | Entered by BBENEDO1 - |
03/12/2019 | SITE - Stormwater Final Inspection | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Provide NOT |
06/21/2018 | SITE - Stormwater Final Inspection | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - NOT READY AT THIS TIME IT WILL NEED TO BE RESCHEDULED DURING THE TIME FRAME THAT THE FINAL INSPECTIONS ARE BEING DONE FOR PHASE 3. SITE VISIT ONLY. |
07/22/2016 | SITE - Stormwater Final Inspection | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT MAKING REPAIRS TO SWPPP CONTROLS. |