Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 03/12/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 01/10/2019 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - CREWS CONTINUE TO WORK ON THE BUILDINGS AND VERY LITTLE SITE WORK. SCHEDULE ANOTHER GRADING INSPECTION AT A LATER DATE TO DISCUSS THE BASIN ISSUES NOTED IN THE STORMWATER FOLLOWUP. |
| 06/21/2018 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - NO READY AT THIS TIME IT WILL NEED TO BE RESCHEDULED DURING THE TIME FRAME THAT THE FINAL INSPECTIONS ARE BEING DONE FOR PHASE 3. SITE VISIT ONLY. |
| 05/17/2018 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER WORK TO COMPLET FOR PHASE #2. |
| 09/01/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 09/16/2016 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - THE REVIEWERS ARE ACCEPTING THE MINOR FLOWS AND ARE BEING ASKED TO CLOSE THE CURRENT PERMITS. IF THIS IS DONE WE WILL NEED REVISED DRAWINGS AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. |
| 07/11/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PAVING WORK ON SOUTH SIDE OF SITE. |
| 10/13/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON RIP-RAP IN BASIN ON NORHT WEST SIDE OF SITE. |
| 03/12/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 04/17/2018 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PROVIDE AP COT PLANS FOR ALL CHANGES TO TRASH ENCLOUSRE. |
| 07/07/2015 |
ENGR Grading Final |
RLEDONNE |
Partial Approval |
Entered by RLEDONN1 - FOOTER PER NEW AP PLANS C5.8 HAS BEEN AP BY COT. |
| 06/08/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PER RED LINE C5.8 FOR B5 CUM WALL #4 FOOTER INSTALLED PER RED LINE. PROVIDE COT AP C5.8 PAGE OF PLANS. |
| 04/29/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 08/29/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 08/15/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 08/10/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 08/01/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 06/19/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 12/03/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 11/17/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY TODAY. |
| 10/22/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY. |
| 08/17/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC NO CONCERNS AT THIS TIME. |
| 08/05/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC ABOUT SWPPP CONTROLS.AND CONCRETE CLEAN UP. |
| 05/27/2015 |
ENGR Grading Final |
RLEDONN1 |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE. |