Permit: DP15-0060

Parcel: 14019277A


Addresses:

5418 S PARK AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP15-0060

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/12/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
03/12/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
01/10/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CREWS CONTINUE TO WORK ON THE BUILDINGS AND VERY LITTLE SITE WORK. SCHEDULE ANOTHER GRADING INSPECTION AT A LATER DATE TO DISCUSS THE BASIN ISSUES NOTED IN THE STORMWATER FOLLOWUP.
06/21/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO READY AT THIS TIME IT WILL NEED TO BE RESCHEDULED DURING THE TIME FRAME THAT THE FINAL INSPECTIONS ARE BEING DONE FOR PHASE 3. SITE VISIT ONLY.
05/17/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER WORK TO COMPLET FOR PHASE #2.
09/01/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
09/16/2016 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - THE REVIEWERS ARE ACCEPTING THE MINOR FLOWS AND ARE BEING ASKED TO CLOSE THE CURRENT PERMITS. IF THIS IS DONE WE WILL NEED REVISED DRAWINGS AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD.
07/11/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PAVING WORK ON SOUTH SIDE OF SITE.
10/13/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON RIP-RAP IN BASIN ON NORHT WEST SIDE OF SITE.
03/12/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
04/17/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PROVIDE AP COT PLANS FOR ALL CHANGES TO TRASH ENCLOUSRE.
07/07/2015 ENGR Grading Final RLEDONNE Partial Approval Entered by RLEDONN1 - FOOTER PER NEW AP PLANS C5.8 HAS BEEN AP BY COT.
06/08/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PER RED LINE C5.8 FOR B5 CUM WALL #4 FOOTER INSTALLED PER RED LINE. PROVIDE COT AP C5.8 PAGE OF PLANS.
04/29/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
08/29/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
08/15/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
08/10/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
08/01/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
06/19/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
12/03/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
11/17/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY TODAY.
10/22/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY.
08/17/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC NO CONCERNS AT THIS TIME.
08/05/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GOT WITH GC ABOUT SWPPP CONTROLS.AND CONCRETE CLEAN UP.
05/27/2015 ENGR Grading Final RLEDONN1 Continued Entered by RLEDONN1 - MET WITH GC ON SITE.