Permit: DP15-0060

Parcel: 14019277A


Addresses:

5418 S PARK AV


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP15-0060

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
03/12/2019 SITE - Stormwater Follow-up BBENEDON Approved Entered by CBELL1 -
01/09/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME. I HAVE ADVISED THE CONTRACTOR THAT THEY WILL NEED TO HAVE THEIR ENGINEER OF RECORD LOOK AT THE BASIN AND DETERMINE WHAT IT WILL NEED FOR THE FINAL RELEASE OF THE SITE. CURRENTLY THERE IS STANDING WATER IN THE BASIN, THIS WATER HAS BEEN STANDING IN PLACE WELL PAST 24 HOURS, THE MAXIMUM TIME LIMITS FOR THIS SITE IS 12 HOURS. A RESOLUTION WILL NEED TO BE SUBMITTED AND APPROVED
10/15/2018 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - Contractor needs to install controls at East entrance. There is some track out present. Clean up track out as needed. GC on-site Steve and Tom
08/21/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT ADDING TRACK OUT ROCK TO SITE.
06/21/2018 SITE - Stormwater Follow-up DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS SHOWING NO CONCERNS AT THIS TIME FOR THE STORMWATER ASPECTS. THE BASIN IS BEING UTILIZED AS A DRY STORAGE AREA FOR THEIR LUMBER, SO I HAVE ADVISED THEM THAT THEY NEED TO ENSURE THAT THIS MATERIAL DOES NOT AFFECT THE WAY THE THAT THE BASIN PERFORMS ITS DUTIES. NOT READY AT THIS TIME IT WILL NEED TO BE RESCHEDULED DURING THE TIME FRAME THAT THE FINAL INSPECTIONS ARE BEING DONE FOR PHASE 3. SITE VISIT ONLY.
05/31/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - MET WITH TOM ALLFONSO AND LOOKED OVER THE SITE. MINOR TRACKOUT NOTED OUT ONTO PARK, CREWS WILL BE WORKING TO CLEAN THIS AREA UP. ALSO NOTED SOME CONCRETE WITHIN THE BASIN AREA THAT NEEDS TO BE REMOVED, THIS WILL BE CLEANED UP THIS WEEKEND.
01/22/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS .
12/12/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NEW TRACK OUT ROCK ADDED.
11/22/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT ADDING TRACK OUT ROCK.
11/17/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE TO ADD TRACK OUT ROCK AND CLEAN STREET.
10/20/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NEW SWPPP SIGN WAS INSTALLED.
10/11/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT INSTALLING NEW SWPPP SIGN.
09/14/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET ON SITE WITH NEW GC WENT OVER SWPPP REPAIRS AND PERMIT CARD.
07/05/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
02/24/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE.
12/19/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/25/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
10/14/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/07/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
09/22/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THERE IS NO TRACK OUT AND THE CONTROLS APPEAR TO BE HOLDING. THE CONTRACTOR HAS MOVED THE SWPPP SIGN OVER TO THE PARK ENTRANCE FOR THE REMAINDER OF THE PROJECT.
09/06/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT MAKING SWPPP REPAIRS.
08/08/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - REPARIS HAVE BEEN MADE.
08/02/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT INSTALLING NEW CONTROLS.
07/14/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
06/27/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
06/01/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
05/03/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - REPAIRS HAVE BEEN MADE TO CONTROL.
04/21/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER SWPPP REPARIS.
04/04/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - STILL HAVE NOT INSTALLED NEW CONTROLS.
03/30/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT NEW CONTROLS AND TRACK OUT ROCK.
03/23/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT TO REPLACE SWPPP CONTROLS.
03/15/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
02/02/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC NO CONCERNS AT THIS TIME.
01/26/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
01/19/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC NO CONCERNS AT THIS TIME.
12/23/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - REPAIRS HAVE BEEN MADE.
11/04/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC.
10/15/2015 SITE - Stormwater Follow-up RLEDONN1 Continued Entered by RLEDONN1 -
10/13/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - TRACKOUT ROCK INSTALLED ON EAST SIDE OF SITE.
10/12/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - STREETS HAVE BEEN CLEANED OFF TRACK OUT FROM STREET.
09/24/2015 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
08/27/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON SOUTH & EAST SIDE OF SITE.
08/25/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
08/07/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
07/07/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 -
06/04/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONERNS AT THIS TIME.
05/29/2015 SITE - Stormwater Follow-up RLEDONN1 Continued Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP CONTROL.