Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2015 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/24/2015 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR DID NOT CALL AN INSPECTION IN FOR A PRE-CONSTRUCTION MEETING.
2) ENSURE YOU CALL FOR INSPECTION FOR ANY UNDERGROUND STORM DRAINAGE WORK PRIOR TO COVER.
HOWEVER; TWO STORM DRAIN LINES HAVE ALREADY BEEN INSTALLED AND NOT INSPECTED DURING INSTALLATION
3) A CERTIFICATION FROM THE ENGINEER OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER HIS/HER APPROVED PLANS.
4) CALL FOR INSPECTION FOR ANY INSTALL OF STORM DRAINAGE STRUCTURES
5) CALL FOR INSPECTION FOR RE-BAR LAYOUT FOR TRASH ENCLOSURES
6) INSTALL SEDIMENT CONTROLS PER YOUR STORM WATER PLAN
WILL FOLLOW UP FOR COMPLIANCE |