Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 11/19/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 11/19/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 09/15/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) TRASH ENCLOSURE ENTRANCE, CONCRETE APRON, AND ENCLOSURE GATES PROTRUDE INTO THE ROW AND ROADWAY.
2) NO CONNECTING SIDEWALK SHOWN ON PLANS |
| 11/19/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 10/27/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 10/26/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT SITE WORK AT THIS TIME |
| 10/05/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS |
| 09/15/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) TRASH ENCLOSURE ENTRANCE, CONCRETE APRON, AND ENCLOSURE GATES PROTRUDE INTO THE ROW AND ROADWAY.
2) NO CONNECTING SIDEWALK SHOWN ON PLANS |
| 08/26/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR STILL FORMING CATCH BASINS, NO CONCRETE TODAY, SITE IS WET FROM RAIN THE NIGHT BEFORE
2) SWEEP UP TRACKED SOIL FROM ADJACENT ROADWAY |
| 08/25/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR FORMING TWO CATCH BASINS WITH #4 BAR AT 18" ON CENTER BOTH WAYS, PER APPROVED PLANS, CONCRETE TOMORROW. |