Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 11/13/2015 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME |
| 10/27/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 10/26/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - ENSURE YOUR SWPPP IS IMPLEMENTED UNTIL THE SITE IS STABILIZED |
| 10/05/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 09/15/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SITE IS REQUIRED TO HAVE A SWPPP DUE TO THE FACT THAT IT IS PART OF A BIGGER DEVELOPMENT.
2) SEDIMENT CONTROLS IN PLACE, STABILIZED CONSTRUCTION ENTRANCE, CONCRETE WASH OUT IN PLACE.
3) POST A COPY OF YOUR NOI
4) PLACE A SIGN AT YOUR WASH OUT
5) SWEEP UP TRACKING
6) PERFORM AND DOCUMENT YOUR SELF INSPECTIONS PER YOUR SWPPP. |
| 08/26/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR STILL FORMING CATCH BASINS, NO CONCRETE TODAY, SITE IS WET FROM RAIN THE NIGHT BEFORE
2) SWEEP UP TRACKED SOIL FROM ADJACENT ROADWAY |
| 08/25/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |