Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP14-0246
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 11/20/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 11/20/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 11/17/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTED INSTALLED STORM PIPE - OK INSTALLED PER APPROVED PLAN. 2) PRIOR TO FINAL APPROVAL PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD |
| 10/27/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 09/24/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CALL FOR FINAL GRADING INSPECTION WHEN APPLICABLE |
| 09/24/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK |
| 09/10/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) LOOKED AT INSTALL OF CATCH BASIN ALONG EAST SIDE OF SITE 2) INSTALL OF 18" RCP PER PLAN 3) PRE-CAST CATCH BASIN TO BE INSTALLED AT SOUTH END OF PIPE PCTURES TAKEN |
| 09/02/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) LOOKED AT 91 LF OF 30" RCP @ 1%MIN SLOPE - PIPE WAS BEDDED TO SPRING LINE AND IN PLACE - EAST SIDE 2) LOOKED AT DOUBLE CURB INLET CATCH BASIN EXCAVATION CALL FOR FOOTING FOR BASIN FLOOR - NEAR MAIN ENTRANCE PICTURES TAKEN OK TO COVER PIPE |
| 08/27/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) BASE OF CATCH BASIN POURED, RE-BAR SET AND FORMS CONSTRUCTED 2) RE-BAR = #4 AT 12" OC BOTH WAYS 3) SEDIMENT CONTROLS HAVE BEEN RE-ESTABLISHED AT THE NEW PERIMETER |
| 08/26/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO INSPECTIONS CALLED IN FOR MANHOLE CONSTRUCTION 2) NEED TO RE-ESTABLISH SEDIMENT CONTROLS AT PERIMETER OF SITE , TO INCLUDE AREA TO THE WEST WHERE CONSTRUCTION HAS EXPANDED BEYOND THE PROPETY LINE. 3) CALL IN FOR INSPECTION FOR ANY UNDERGROUND STORM WORK, APPROVALS WILL NOT BE GIVEN FOR SITE WORK NOT INSPECTED 4) PROVIDE A CERT LETTER FROM THE ENG OF RECORD PRIOR TO FINAL 5) ENSURE STORM WATER SELF INSPECTIONS |
| 07/17/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTORS WORKING ON WELDING THE BLDG |
| 06/02/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SECTION OF RCP STORM PIPE INSTALLED PER APPROVED PLAN - OK TO COVER , PICTURES TAKEN 2) ENSURE TEMPORARY STOCKPILE HAS SEDIMENT CONTROLS INSTALLED ALONG THE DOWN SLOPE SIDE 3) WILL RE-INSPECT ON ROUTINE BASIS |
| 05/14/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALLING SECTIONS OF 48" RCP AND TWO MANHOLES, PICTURES TAKEN. 2) ENSURE PIPE IS BEDDED TO THE SPRING LINE AND IS INSTALLED PER PLAN. 3) WILL RE-INSPECT PRIOR TO COVER |