Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP14-0246
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2015 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
| 10/27/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 09/24/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - MAY NEED SUPPLEMENTAL SEDIMENT CONTROLS ALONG THE NORTH SIDE OF SITE IN ORDER TO COMPLY WITH YOUR SWPPP |
| 09/24/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 09/15/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 2) SWEEP UP TRACKED SOIL AS NEEDED |
| 09/02/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 08/27/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) BASE OF CATCH BASIN POURED, RE-BAR SET AND FORMS CONSTRUCTED 2) RE-BAR = #4 AT 12" OC BOTH WAYS 3) SEDIMENT CONTROLS HAVE BEEN RE-ESTABLISHED AT THE NEW PERIMETER |
| 08/26/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO INSPECTIONS CALLED IN FOR MANHOLE CONSTRUCTION 2) NEED TO RE-ESTABLISH SEDIMENT CONTROLS AT PERIMETER OF SITE , TO INCLUDE AREA TO THE WEST WHERE CONSTRUCTION HAS EXPANDED BEYOND THE PROPETY LINE. 3) CALL IN FOR INSPECTION FOR ANY UNDERGROUND STORM WORK, APPROVALS WILL NOT BE GIVEN FOR SITE WORK NOT INSPECTED 4) PROVIDE A CERT LETTER FROM THE ENG OF RECORD PRIOR TO FINAL 5) ENSURE STORM WATER SELF INSPECTIONS |
| 08/17/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 07/17/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 06/24/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 06/02/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - INSTALL SEDIMENT CONTROLS AROUND TEMP. STOCKPILE |
| 05/14/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE YOU INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE |