Permit: DP14-0235

Parcel: 99999999A

Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
02/26/2021 SITE - Stormwater Setup and Controls DROBERTS Approved Entered by VLEON1 - APPROVED
07/28/2020 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by RSALDAT1 - Continued. Controls along south perimeter require correction. Erosion present in newly constructed basin. Jamie at 306-0369
05/28/2020 SITE - Stormwater Setup and Controls BBENEDON Approved Entered by RSALDAT1 -
11/14/2018 SITE - Stormwater Setup and Controls bbenedo1 Continued Entered by BBENEDO1 - Controls in place at Silverbell entrance. Waddle has been replaced as needed.
10/30/2018 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by CBELL1 - Controls at Goret entrance okay. Provide controls to prevent track out at Silverbell road entrance to site. Schedule an inspection for stormwater controls.