Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP14-0235

Parcel: 99999999A

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP14-0235

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
06/10/2021 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VLEON1 - PARTIAL/NEED TO REMOVE ALL THE MATERIAL ON SITE AND HYDROSEED THE SLOPE.
03/16/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME. FINAL NOT TO BE GIVEN TILL ALL EXCESS MATERIAL FROM THIS SITE HAS BEEN REMOVED, GENERAL CLEANUP OF THE SITE IS DONE, STORMWATER CONTROLS HAVE BEEN REMOVED. PROVIDE THIS DEPARTMENT WIT THE NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, AS WELL AS APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. CHECKING OF ALL DISTURBED AREAS TO VERIFY THAT THEY HAVE BEEN HYDRO SEEDED EITHER IN THE PAST OR RECENTLY AS REQUIRED BY THE UNIFIED DEVELOPMENT CODE.
02/26/2021 ENGR Engineering Final DROBERTS Continued Entered by VLEON1 - CONTINUED, WORK ONGOING AT THIS TIME FINAL NOT TO BE GIVEN TILL WORK IS COMPLETE, STORMWATER CONTROLS HAVE BEEN REMOVED, AND ALL EXCESS CONSTRUCTION MATERIAL IS REMOVED FROM THIS SITE.
09/14/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by JSCHNEI2 - THE SITE HAS BEEN CHECKED FOR THE CORRECTIONS THAT THAVE BEEN NOTED DURING THE PREVIOUS INSPECTION. MARK WITH DR HORTON WILL BE CONTACTING THE TITLE AGENCY TO ASK FOR THE RELEASE OF THE COMMON AREAS (ROAD WAYS AND DRAINAGE WAYS). THERE ARE STILL ABOUT 10 LOTS THAT ARE UNDER CONSTRUCTION AND 2UNDEVELOPED LOTS WHICH STILL NEED THE SIDEWALKS AND DRIVEWAYS TO BE COMPLETED. ALSO HE WILL ENSURE THAT ALL THE REMAINING NURSERY STAKES ARE REMOVED FROM ALL PLANTS THROUGHOUT THE SITE. TO CLOS THIS SITE I HAVE ADVISED MARKTHAT HE WILL ALSO NEED THE NOTICE OF TERMINATION FROM THE DEPARTMENT OF ENVIRONMENTAL QUALITY, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE.
08/24/2020 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by JSCHNEI2 - NOT READY AT THIS TIME, SITE INSPECTION TO SEE IF IT IS READY FOR THE FINAL INSPECTIONS. DURING THIS INSPECTION THE FOLLOWING ITEMS WERE DISCUSSED THAT WILL NEED ADDITIONAL ATTENTION PRIOR TO CONSIDERING THIS SITE FOR FINAL CLOSURE OF ALL PERMITS
08/14/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Repair erosion in several places in Basin walls. Terminate SwPPP. Remove all temporary stormwater controls. Stabilized any remaining undeveloped lots. Clean all muddy track out within subdivision. Clean all construction debris. Remove nursery stakes from trees.
07/14/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Site is Roughly 50% complete. There are many disturbed areas and material stock piles. Stormwater controls are still in place. Nursery stakes have not been removed from some trees. There is some erosion present in basin areas.
01/02/2024 ENGR Engineering Final Partial Pass No plans were available during the site visit to verify what work still needs to be done. Minor erosion has been noted in all the basins along the outer areas that will need to be repaired prior to the final sign off